Retrieving RFP details
Release
Close
W6QM Micc-Ft Leavenworth
This work may include demolition and disposal of existing elevator, and replacement with a new elevator to support Sustainment, Restoration, and Maintenance. Building 246 requires a full demolition and replacement of its’ existing MRL elevator and associated equipment and support structure. The record drawings for the most recent renovation and elevator repairs shall be provided in this solicitation. The new elevator shall be installed with a 100% non-proprietary system, being that when future maintenance is required, any elevator repair technician has the capability of performing repairs, obtaining parts and obtaining as-required troubleshooting technical support from the component manufacturer’s tech support team. The contractor shall provide 3 front openings with 24’3” of travel that opens at 100 FPM. The new elevator shall be hydraulic, holeless, roped, single jack, cantilever, passenger elevator with a 4,500 lb. capacity.
Southwestern Community College
Seeking proposals from qualified vendors to furnish, deliver, install, and commission an elevator system for the founders building.
Naval Supply Systems Command (NAVSUP)
1377 - 1377-01-246-5279, Mt291377-01-246-5280, Mt301377-01-246-5281, Mt31, Qty 921 Ea, CLINS 0002 and 0003 Combined total option up to 317 Ea.
The University Of Texas Health Science Center At San Antonio
Work consists of roof replacement at the school of public health bldg.
Joint Meeting of Essex and Union Counties
Provide digester elevator replacement work.
Release
Jan 14, 2025
Close
Feb 04, 2025