Logo

starbridge

Book a Demo
RFPs/Synopsis Bldg. 246 Elevator Replacement Ft. Leavenworth

Synopsis Bldg. 246 Elevator Replacement Ft. Leavenworth

Dept of the Army, Army Contracting Command, MICC

Summary

This work may include demolition and disposal of existing elevator, and replacement with a new elevator to support Sustainment, Restoration, and Maintenance. Building 246 requires a full demolition and replacement of its’ existing MRL elevator and associated equipment and support structure. The record drawings for the most recent renovation and elevator repairs shall be provided in this solicitation. The new elevator shall be installed with a 100% non-proprietary system, being that when future maintenance is required, any elevator repair technician has the capability of performing repairs, obtaining parts and obtaining as-required troubleshooting technical support from the component manufacturer’s tech support team. The contractor shall provide 3 front openings with 24’3” of travel that opens at 100 FPM. The new elevator shall be hydraulic, holeless, roped, single jack, cantilever, passenger elevator with a 4,500 lb. capacity.

Files

No files

Details

Release

Jan 14, 2025

Close

Feb 04, 2025

Contacts

Source