State AgencyAL
Posted
Oct 12, 2026
Nov 12, 2026
McDuffie 43E Low Voltage Switchboard RFP
Procurement of a 480/277 volt switchboard for building 43 East at McDuffie Coal Terminal in Mobile, Alabama.
Description: NAVSUP Weapon Systems Support Mechanicsburg is soliciting the manufacture and design of a switchboard alarm meeting the requirements in the ordering data and contract. The stated manufacturer is Marine Electric Systems Inc., and the specified part number is IC/M25X2(3W)R-TM; the posting says no technical drawings or data are associated with the solicitation. Offers are due December 2, 2026, and the posting asks for pricing valid for 60 days after closing unless otherwise stated.
Federal · DC, US
Original attachments and procurement documents tied to this bid.
Federal RFP files are for Starbridge customers only.
You can request RFP files from all other buyer types for free on this site.
Decision makers connected to this RFP from Department of the Navy.
Adjacent opportunities open for bidding right now.
State AgencyAL
Posted
Oct 12, 2026
Nov 12, 2026
Procurement of a 480/277 volt switchboard for building 43 East at McDuffie Coal Terminal in Mobile, Alabama.
Charlotte-Mecklenburg School District
School DistrictNC
Posted
Nov 5, 2026
Nov 30, 2026
The Formal bid for Switchboard Replacement/Upgrade at Olympic High School, 4301 Sandy Porter Road, Charlotte, NC 28273 will be received by the Owner at 3301 Stafford Drive, Charlotte, NC 28208
Charlotte-Mecklenburg School District
School DistrictNC
Posted
Nov 5, 2026
Nov 30, 2026
The Formal bid for Switchboard Replacement/Upgrade at Olympic High School, 4301 Sandy Porter Road, Charlotte, NC 28273 will be received by the Owner at 3301 Stafford Drive, Charlotte, NC 28208
CityCA
Posted
Oct 28, 2026
Dec 8, 2026
The City of San Diego seeks qualified contractors to replace the raw-water pressure-switch switchboard at the Otay Water Treatment Plant. The work includes demolishing the existing ATS shed and switchboard and installing a new medium-voltage switchboard with an integrated ATS, a permanent standby generator, associated underground electrical work, site improvements, and commissioning. The lump-sum construction project is estimated at approximately $2.75 million, has a 312-working-day schedule, and is subject to prevailing-wage, Project-Labor-Agreement, and SLBE/ELBE participation requirements.