Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consist of improvement includes structural repairs and patching to the existing concrete beams and concrete beam ends, concrete repair to various bridge components, concrete cleaning/sealing, cleaning and painting of corroded bearings, spot and zone painting of steel girders, approach pavement removal and replacement, and traffic control.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Viaduct Rehabilitation: The work of this contract consists of bringing the route 100 high speed line bridge 12. 81 over the schuylkill river to a state of good repair and includes the following: 1. Lead paint abatement/containment. All existing steel coatings shall be considered as containing lead. 2. Complete cleaning and painting of the structural steel viaduct (excluding handrails on transportation center canopy, platform and stair 2 support columns and vestibule. 3. Structural steel repairs including pack rust removal, lacing bar repair, secondary member replacement, bearing web stiffener replacement, rivet and bolt replacement, bottom chord web plate replacement detail (type g), and span 12 web stiffener repair. 4. Replacement of bottom struts in spans 25 to 32. 5. Concrete substructure cleaning, repairs and coatings. 6. Full depth inspection of viaduct including pin ultrasonic testing and sampling of steel coupons for material testing. 7. Replacement of bearings in spans 25 to 32. 8. Rehabilitation of bearings in spans 1 to 24, and piers 42 and 43. 9. Construction of new steel inspection walkway at river truss (spans 25 - 32). 10. Removal of abandoned utilities supported by viaduct structure. 11. Pier cap 42a steel repairs. 12. Bird deterrent system. 13. Concrete encasement of steel columns and struts. 14. Downspout repairs. 15. Removal and replacement of fiberglass grating track level walkways and add fiberglass grating within rail gauge. 16. Span 33 to 36 concrete deck slab demolition and replacement including associated track work. Removal and reinstallation of rail, ties, ballast, and 3rd rail. 17. Rock construction entrances, river access mats, and erosion and sedimentation pollution control. 18. River pier scour remediation. 19. Vegetated drainage channel. 20. Maintenance and protection of traffic and navigation. 21. Replace concrete sidewalks and curbs where existing sidewalk is disturbed. 22. Locally re-grade ground to expose steel tower bases that are to receive concrete encasement and for drainage. All disturbed soil to remain on site. 23. Protection of existing utilities. 24. Replacement of transportation center stair 2. 25. Repair and replacement of work damaged as a result of work of this contract.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Posted Date
Dec 1, 2025
Due Date
Jan 15, 2026
Release: Dec 1, 2025
Close: Jan 15, 2026
Viaduct Rehabilitation: The work of this contract consists of bringing the route 100 high speed line bridge 12. 81 over the schuylkill river to a state of good repair and includes the following: 1. Lead paint abatement/containment. All existing steel coatings shall be considered as containing lead. 2. Complete cleaning and painting of the structural steel viaduct (excluding handrails on transportation center canopy, platform and stair 2 support columns and vestibule. 3. Structural steel repairs including pack rust removal, lacing bar repair, secondary member replacement, bearing web stiffener replacement, rivet and bolt replacement, bottom chord web plate replacement detail (type g), and span 12 web stiffener repair. 4. Replacement of bottom struts in spans 25 to 32. 5. Concrete substructure cleaning, repairs and coatings. 6. Full depth inspection of viaduct including pin ultrasonic testing and sampling of steel coupons for material testing. 7. Replacement of bearings in spans 25 to 32. 8. Rehabilitation of bearings in spans 1 to 24, and piers 42 and 43. 9. Construction of new steel inspection walkway at river truss (spans 25 - 32). 10. Removal of abandoned utilities supported by viaduct structure. 11. Pier cap 42a steel repairs. 12. Bird deterrent system. 13. Concrete encasement of steel columns and struts. 14. Downspout repairs. 15. Removal and replacement of fiberglass grating track level walkways and add fiberglass grating within rail gauge. 16. Span 33 to 36 concrete deck slab demolition and replacement including associated track work. Removal and reinstallation of rail, ties, ballast, and 3rd rail. 17. Rock construction entrances, river access mats, and erosion and sedimentation pollution control. 18. River pier scour remediation. 19. Vegetated drainage channel. 20. Maintenance and protection of traffic and navigation. 21. Replace concrete sidewalks and curbs where existing sidewalk is disturbed. 22. Locally re-grade ground to expose steel tower bases that are to receive concrete encasement and for drainage. All disturbed soil to remain on site. 23. Protection of existing utilities. 24. Replacement of transportation center stair 2. 25. Repair and replacement of work damaged as a result of work of this contract.
AvailableNE 9th Street Resurfacing is a City of Gainesville public works sealed-bid solicitation to resurface NE 9th Street from East University Avenue to NE 23rd Avenue including pavement rehabilitation, intersection widening, and accessibility and multimodal safety improvements. Bidders must download the bid documents (specifications, plans, draft contract) from the City of Gainesville Procurement Portal attachments/downloads. The solicitation was posted 2025-12-23 and has a sealed-bid response deadline of 2026-01-28 00:00 Eastern Time.
Posted Date
Dec 23, 2025
Due Date
Jan 28, 2026
Release: Dec 23, 2025
Close: Jan 28, 2026
NE 9th Street Resurfacing is a City of Gainesville public works sealed-bid solicitation to resurface NE 9th Street from East University Avenue to NE 23rd Avenue including pavement rehabilitation, intersection widening, and accessibility and multimodal safety improvements. Bidders must download the bid documents (specifications, plans, draft contract) from the City of Gainesville Procurement Portal attachments/downloads. The solicitation was posted 2025-12-23 and has a sealed-bid response deadline of 2026-01-28 00:00 Eastern Time.
AvailableWork consists of street and alley rehabilitation.
Posted Date
Dec 5, 2025
Due Date
Jan 8, 2026
Release: Dec 5, 2025
Close: Jan 8, 2026
Work consists of street and alley rehabilitation.
AvailableThe rehabilitation of the existing mckinley street bridge including installation of new prestressed concrete box beams and reconstruction of the approaching roadway.
Posted Date
Dec 22, 2025
Due Date
Jan 14, 2026
Release: Dec 22, 2025
Close: Jan 14, 2026
The rehabilitation of the existing mckinley street bridge including installation of new prestressed concrete box beams and reconstruction of the approaching roadway.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →