Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of the installation of 3 check structures and 1 retrofit to an existing check structure
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide aquifer pump tests. See attached file.
Posted Date
-
Due Date
Jan 13, 2026
Release: -
Close: Jan 13, 2026
Provide aquifer pump tests. See attached file.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Missouri Department of Natural Resources seeks proposals to perform constant-rate aquifer pump tests at eight well-testing sites in the Branson area; tests should be conducted at 1.5 times the designed production rate. The contractor must supply required equipment, have experience installing groundwater well pumps (including appropriate state permits), and provide data logging and water management for a contract through June 30, 2026. The solicitation is for procurement of testing services (not a grant) and includes compliance and reporting requirements per state and federal regulations.
Posted Date
Dec 29, 2025
Due Date
Jan 13, 2026
Release: Dec 29, 2025
Close: Jan 13, 2026
The Missouri Department of Natural Resources seeks proposals to perform constant-rate aquifer pump tests at eight well-testing sites in the Branson area; tests should be conducted at 1.5 times the designed production rate. The contractor must supply required equipment, have experience installing groundwater well pumps (including appropriate state permits), and provide data logging and water management for a contract through June 30, 2026. The solicitation is for procurement of testing services (not a grant) and includes compliance and reporting requirements per state and federal regulations.
AvailableMadera County is soliciting competitive bids to construct the Chowchilla Subbasin Recharge Project 1, a groundwater recharge project in Madera County, California. The scope includes construction of recharge-related facilities and site work, with a mandatory pre-bid meeting on January 9, 2026, and questions due January 16, 2026. Bids are due January 23, 2026 at 2:00 pm PT via the County’s BidExpress portal.
Posted Date
-
Due Date
Jan 23, 2026
Close: Jan 23, 2026
Madera County is soliciting competitive bids to construct the Chowchilla Subbasin Recharge Project 1, a groundwater recharge project in Madera County, California. The scope includes construction of recharge-related facilities and site work, with a mandatory pre-bid meeting on January 9, 2026, and questions due January 16, 2026. Bids are due January 23, 2026 at 2:00 pm PT via the County’s BidExpress portal.
AvailableWork is generally includes demolition and modification of the existing production well facility, modification of existing mechanical, piping, electrical, instrumentation, and control systems, installation of new yard piping (raw water, potable water, storm drain), electrical conduits, and instrumentation, installation of downhole control valves and new column piping, ancillary improvements in support of the foregoing.
Posted Date
Nov 20, 2025
Due Date
Jan 12, 2026
Release: Nov 20, 2025
Close: Jan 12, 2026
Work is generally includes demolition and modification of the existing production well facility, modification of existing mechanical, piping, electrical, instrumentation, and control systems, installation of new yard piping (raw water, potable water, storm drain), electrical conduits, and instrumentation, installation of downhole control valves and new column piping, ancillary improvements in support of the foregoing.