Summary
This project consists of the removal and replacement of two existing rooftop-mounted condensing units and one air handler unit (AHU) located within the interior mechanical attic due to end-of-life conditions. At the existing mechanical well, work also includes a new access ladder, cleaning of the existing Hypalon roofing membrane, and
installation of new liquid-applied flashing at existing conduit penetrations and equipment curbs associated with the new condensing unit replacement. Replacement of the AHU will require removal and reinstallation of the existing mechanical attic access door, with
associated wall patching and painting as required to restore adjacent finishes. New HVAC Equipment to be connected to existing campus Alerton DDC System.