Summary
To provide all labor, supervision, materials, tools, supplies, transportation, personal protection equipment, and support equipment incidental for the Replacement of HVAC Systems at Various Buildings. A. Base item work consists of: 1. Chimborazo Visitor Center: Replace heat pump, Replace AHU, Install VAV boxes, clean ductwork existing and commission systems and install new controls. 2. Cold Harbor Visitor Center: Replace heat pump, replace exhaust fans, clean ductwork existing and commission systems and install new controls. 3. Watt House: Replace heat pump, clean ductwork existing and commission systems and install new controls. 4. Ranger Office, 1900 Maintenance Way: Replace heat pump, clean ductwork existing and commission systems and install new controls. 5. Maintenance Building: Replace heat pump, install new mini-split, install new attic fans, Clean existing ductwork, commission systems and install new controls. 6. Auto Shop: Remove PTAC and install new mini-split, replace boiler, clean ductwork existing and commission systems and install new controls.