Supplying ACSS & AAC Conductor for the Ancient Lake - Frenchman Hills 115kV Line Rebuild RFP
Supplying acss & aac conductor.
Description: Grant County PUD is soliciting ACSS & AAC conductor for the Ancient Lake - Frenchman Hills 115kV Line Rebuild under bid 170-13385. The official ProcureWare detail page identifies the opportunity as a Bid, marks it Open for Bidding, confirms it is not a grant program, and exposes no primary PDF, DOC, DOCX, or PPT attachment. The page lists an Available Date of 7/31/2026 9:30 AM and a Due Date of 9/2/2026 2:00 PM in America/Los_Angeles (UTC-07:00), represented below in the required ISO-Z format.
SpecialDistrict · WA, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalProcurement and program contacts connected to Grant County Public Utility District 2.
Adjacent opportunities open for bidding right now.
CountyWA
Jul 31, 2026
Closes
Sep 2, 2026
Supplying acss & aac conductor.
Western Area Power Administration (WAPA)
Special DistrictCO
Apr 28, 2026
Closes
Aug 3, 2026
The Upgrade consists of replacing the LRT-GLD line with a new 115-kV wood pole H-frame transmission line. The new Quinn Creek Substation (QCK), with a 69-kV delivery point, will be constructed on about 5 acres on open rangeland. The Upgrade will be sectionalized into a 25.4-mile-long section called Casper (Pace)-Quinn Creek (CPL-QCK), a 9.4-mile-long Quinn Creek-Lusk Rural Tap (QCK-LRT) will be constructed to 115-kV specifications but operated at 69-kV for the near term. The Upgrade will be constructed on existing ROW, widened by 20 to 25 feet to provide proper clearance for the higher voltage, lengthened spans, and potentially greater blow-out.
Pend Oreille County Public Utility District 1
Special DistrictWA
Jul 14, 2026
Closes
Aug 6, 2026
Furnish and deliver dap destination, each three-phase, 115 kv, 2000- amp power circuit breaker(s).
CityFL
Jun 12, 2026
Closes
Aug 4, 2026
1-115kV steel deadend line terminal; 3-115kV steel bus support, single phase, low; 1-115kV steel bus support, single phase, high; 3-115kV steel, ccvt support, single phase, low; 1-115kV steel bus support, three phase, high; 1-115kV steel, breaker disconnect switch support; 2-115kV steel CT support, three phase.