Higher EducationHI
Posted
-
Dec 11, 2026
UHM - Frear Hall Mail Room Improvements 2025 RFP
Convert the room into a more efficient and official Mail Room includes but not limited to removal of the existing door entries, door frames and associated hardware, existing flooring and wall base, and removal of existing acoustic ceiling grid and panels as well as fluorescent light fixtures throughout. Removal of existing mail boxes in entry Lobby will be in scope as well as the refinishing of wall and floor surfaces following removal. New scope generally includes new corner guards, finish cabinetry, countertop, penetrating firestopping, sealants, new fire rated hollow metal doors and associated door frame, door hardware, glazing, overhead coiling doors, gypsum board interior wall partitions, and ceiling soffits, resilient tile flooring, interior painting, added fire extinguishers, addressable fire alarm, adjustments to the existing air-conditioning register locations w/ register replacement, electrical and data work for new and relocated outlets/receptacles, access controlled card readers, security cameras and new lighting throughout.
