Posted
Sep 4, 2026
Sep 17, 2026
1232SA26Q1080 5HP Paddlewheel Aerators USDA-ARS-SEA Stoneville MS (Request for Quotations)
6 ea, 5HP paddlewheel aerators.
Description: Supply and Install new Emergency Power Transfer Switch and Controls for 500 Ton York Chiller #2, Model #YKESEQQ6-CRG. Vendor will install new 800 amp, 480volt Asco transfer switch, or approved equal. Vendor will use approx. 75’ of existing 3 ½” rigid conduit in place and provide approx. 45’ of new 3 ½” rigid conduit to complete the tie-ins. Vendor will use existing GE 800-amp spare breaker in place. Vendor will incorporate the new transfer switch with existing Johnson Controls system which must be configured to allow only one chiller to be in operation while under emergency power.
Federal · DC, US
Original attachments and procurement documents tied to this bid.
Federal RFP files are for Starbridge customers only.
You can request RFP files from all other buyer types for free on this site.
Decision makers connected to this RFP from Forest Service.
Adjacent opportunities open for bidding right now.
Posted
Sep 4, 2026
Sep 17, 2026
6 ea, 5HP paddlewheel aerators.
CityAZ
Posted
Sep 11, 2026
Oct 9, 2026
Provide preventive maintenance and repair services for epss equipment. The city operates more than 300 generators across the phoenix metropolitan area that support multiple departments and require services such as but not limited to: preventive maintenance, inspections, fuel delivery, fuel testing, fuel polishing, load bank testing, repairs, and emergency response for both stationary and mobile generators, ats units, and fire pumps.
Fraser Valley Regional District
CountyBC
Posted
Aug 31, 2026
Sep 19, 2026
Request for proposals for the operation and maintenance of the Sylvester Road Transfer Station.
Region 8 Planning and Development Council
Special DistrictWV
Posted
Sep 2, 2026
Oct 5, 2026
Repair and paving of approx. 1,400 LF of access road. Work includes cleaning entire side ditch, from route 28 to the entrance gate of the facility, of loose material and vegetation; milling of start and stop points; cleaning of areas to be paved; application of tac coat; wedge level asphalt 1/2" - 1" as needed; top coat with 2" of 12.5 mm asphalt.