Marysvale Well Improvement Project
The project include the following work: drilling and installing a well. 1 LS mobilization; 1 LS grub and prep well site; 1 LS surface seal witness; 1000 LF drill, ream and condition 16" diameter bore hole; 800 LF furnish and install 8" high strength low alloy (HSLA) casing; 200 LF furnish and install 8" high strength low alloy (HSLA) ful flo louvered screen; 105 CF furnish and install surface seal-grout; 925 CF furnish and install gravel pack filter material; 1 LS geophysical log; 80 HR well development; 1 LS install test pump equipment; 48 HR step and constant rate test.