Lift Station 23 Rehabilitation and Force Main
Work includes approx 0.30 AC clearing and grubbing; 100 LF of 8" HDPE SDR11 sewer force main (directional bore); 3,000 SY sodding; 100 LF of 6' fencing.
Description: Work includes 1 LS erosion and sediment control; 1 LS dewatering trench nuisance water; 1 LS demolition; 939 lf 10" dr 11 hdpe force main ; 1 LS lift station site piping modifications; 1 LS rehabilitate lift station vertical discharge force main piping by primus liner; 1 LS pumps replacement; 1 LS electrical/instrumentation and controls work; 1 LS demolish and replace existing retaining wall; 1 LS lift station gate improvements; 1 LS wet well access manhole frame and cover replacement. See outside link.
City · CA, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityFL
Posted
Aug 25, 2026
Sep 24, 2026
Work includes approx 0.30 AC clearing and grubbing; 100 LF of 8" HDPE SDR11 sewer force main (directional bore); 3,000 SY sodding; 100 LF of 6' fencing.
CityCA
Posted
Sep 3, 2026
Oct 15, 2026
Provide construction management, inspection and administration services for the lift station rehabilitation and force main relocation project.
CityTX
Posted
Aug 20, 2026
Sep 24, 2026
Construction of 23rd street lift station force main rehabilitation and supplemental improvements includes install temporary erosion, sedimentation, and environmental controls, complete in place; 60 LF of trench excavation protection (all depths), including a pe stamped trench safety plan; barricades, signs, and traffic handling; groundwater control for all open cut excavation operations, complete in place; 75 lf of remove and dispose of existing concrete curb, as shown on the plans; remove and dispose of remaining driveway section, as called out on the plan set; full depth 6 inch concrete driveway construction with 6" of compacted subgrade, to match existing driveway profile and limits; 80 LF of replacement of concrete curb to match existing type, dimensions, and profile, complete in place; remove and replace existing 8 security fence and posts per plans and details. See outside link.
CityGA
Posted
Aug 11, 2026
Sep 11, 2026
The City of Valdosta is soliciting construction bids for the Stallings Lift Station & Force Main Improvements project, including a new sanitary sewage lift station and approximately 3,800 linear feet of sewer force main. The work also includes demolition, repairs, patching, grading, grassing, and compliance with applicable Georgia Department of Transportation and City of Valdosta standards, with a 300-calendar-day performance period. This is an open public-works procurement, not a grant program, with a response deadline of September 11, 2026 and a mandatory pre-bid meeting scheduled for August 25, 2026.
Decision makers connected to this RFP from City of Pismo Beach.