Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Remove and dispose of three (3) existing solar light pole assemblies including fixture head, solar panel, battery box and lead acid batteries. Re-use existing concrete footing and threaded anchor with new high-strength grout at base. Install three (3) new owner-furnished solar light pole assemblies on existing concrete footings with new galvanized leveling nuts and top nuts. Contractor shall furnish all labor to receive, unload, inspect and store solar light pole assemblies on site. Contractor shall coordinate with manufacturer for shipping and delivery.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Light pole, park bench, garbage can painting program.
Posted Date
Jan 8, 2026
Due Date
Jan 23, 2026
Release: Jan 8, 2026
Close: Jan 23, 2026
Light pole, park bench, garbage can painting program.
Provide all equipment, labor, materials, and incidentals necessary to remove and replace the existing light fixtures at elementary school.
Posted Date
Jan 5, 2026
Due Date
Feb 4, 2026
Release: Jan 5, 2026
Close: Feb 4, 2026
Provide all equipment, labor, materials, and incidentals necessary to remove and replace the existing light fixtures at elementary school.
AvailableProviding all labor, materials and equipment to design and construct a roof-mounted solar photovoltaic system.
Posted Date
Jan 14, 2026
Due Date
Feb 24, 2026
Release: Jan 14, 2026
Close: Feb 24, 2026
Providing all labor, materials and equipment to design and construct a roof-mounted solar photovoltaic system.
AvailableThe City is requesting signal pole, light pole, and strain pole restoration services. This work will consist of preparing and resurfacing existing traffic signal mast arms, upright signal poles and decorative bases as well as pedestrian light poles and strain poles, while protecting pedestrian and vehicular traffic and property within the work zone and adjacent areas.
Posted Date
Jan 7, 2026
Due Date
Feb 10, 2026
Release: Jan 7, 2026
Close: Feb 10, 2026
The City is requesting signal pole, light pole, and strain pole restoration services. This work will consist of preparing and resurfacing existing traffic signal mast arms, upright signal poles and decorative bases as well as pedestrian light poles and strain poles, while protecting pedestrian and vehicular traffic and property within the work zone and adjacent areas.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis