Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provision of qualified engineering consultant/consultant team to provide engineering services for the sub-regional operating group 91st avenue wastewater treatment plant solids rehabilitation phase 2. Services may include engineering analyses, design, permitting, programming, and possible construction administration and inspection services.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide preconstruction services and complete construction services for the Sub-Regional Operating Group - 91st Avenue Wastewater Treatment Plant Solids Rehabilitation Phase 2 Construction Manager at Risk (CMAR) project. This project will include the rehabilitation and replacement of equipment associated with solids digestion, including replacement of fixed covers for two digesters, pumps, motors, heat exchangers, piping, valves, control instruments, control panels, and electrical equipment including panels, variable frequency drives, transformers, and motor control centers.
Posted Date
Jan 8, 2026
Due Date
Feb 20, 2026
Release: Jan 8, 2026
Close: Feb 20, 2026
Provide preconstruction services and complete construction services for the Sub-Regional Operating Group - 91st Avenue Wastewater Treatment Plant Solids Rehabilitation Phase 2 Construction Manager at Risk (CMAR) project. This project will include the rehabilitation and replacement of equipment associated with solids digestion, including replacement of fixed covers for two digesters, pumps, motors, heat exchangers, piping, valves, control instruments, control panels, and electrical equipment including panels, variable frequency drives, transformers, and motor control centers.
AvailableWork includes wastewater treatment facilities rehabilitation for the installation/replacement/repair of mechanical, civil, structural, electrical, and instrumental & control equipment, programming, emergency repairs, pre/post construction services, and engineering design services as requested at city wastewater treatment facilities. Installations and/or replacement of mechanical equipment, such as but not limited to, pumps, motors, chemical storage tanks, chemical feed equipment and piping, valves and/or actuators that will improve flexibility and operational efficiency of the facility. See attached file.
Posted Date
Jan 13, 2026
Due Date
Jan 30, 2026
Release: Jan 13, 2026
Close: Jan 30, 2026
Work includes wastewater treatment facilities rehabilitation for the installation/replacement/repair of mechanical, civil, structural, electrical, and instrumental & control equipment, programming, emergency repairs, pre/post construction services, and engineering design services as requested at city wastewater treatment facilities. Installations and/or replacement of mechanical equipment, such as but not limited to, pumps, motors, chemical storage tanks, chemical feed equipment and piping, valves and/or actuators that will improve flexibility and operational efficiency of the facility. See attached file.
Operates one (1) wastewater treatment plant with a permitted annual average daily flow of 9.5 mgd and capacity of 10.45 mgd three month average daily flow (tmadf), approx. 420 miles of gravity sewer collection system, 197 wastewater lift stations, and about 40 miles of force mains which have been in service since the 1970s.
Posted Date
Dec 8, 2025
Due Date
Jan 27, 2026
Release: Dec 8, 2025
Close: Jan 27, 2026
Operates one (1) wastewater treatment plant with a permitted annual average daily flow of 9.5 mgd and capacity of 10.45 mgd three month average daily flow (tmadf), approx. 420 miles of gravity sewer collection system, 197 wastewater lift stations, and about 40 miles of force mains which have been in service since the 1970s.
Provide bio-solids hauling and management for the wastewater treatment plant.
Posted Date
Jan 22, 2026
Due Date
Feb 12, 2026
Release: Jan 22, 2026
Close: Feb 12, 2026
Provide bio-solids hauling and management for the wastewater treatment plant.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis