Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide preconstruction services and complete construction services for the Sub-Regional Operating Group - 91st Avenue Wastewater Treatment Plant Solids Rehabilitation Phase 2 Construction Manager at Risk (CMAR) project. This project will include the rehabilitation and replacement of equipment associated with solids digestion, including replacement of fixed covers for two digesters, pumps, motors, heat exchangers, piping, valves, control instruments, control panels, and electrical equipment including panels, variable frequency drives, transformers, and motor control centers.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provision of qualified engineering consultant/consultant team to provide engineering services for the sub-regional operating group 91st avenue wastewater treatment plant solids rehabilitation phase 2. Services may include engineering analyses, design, permitting, programming, and possible construction administration and inspection services.
Posted Date
Jan 8, 2026
Due Date
Feb 20, 2026
Release: Jan 8, 2026
Close: Feb 20, 2026
Provision of qualified engineering consultant/consultant team to provide engineering services for the sub-regional operating group 91st avenue wastewater treatment plant solids rehabilitation phase 2. Services may include engineering analyses, design, permitting, programming, and possible construction administration and inspection services.
AvailableProvide bio-solids hauling and management for the wastewater treatment plant.
Posted Date
Jan 22, 2026
Due Date
Feb 12, 2026
Release: Jan 22, 2026
Close: Feb 12, 2026
Provide bio-solids hauling and management for the wastewater treatment plant.
AvailableOperates one (1) wastewater treatment plant with a permitted annual average daily flow of 9.5 mgd and capacity of 10.45 mgd three month average daily flow (tmadf), approx. 420 miles of gravity sewer collection system, 197 wastewater lift stations, and about 40 miles of force mains which have been in service since the 1970s.
Posted Date
Dec 8, 2025
Due Date
Jan 27, 2026
Release: Dec 8, 2025
Close: Jan 27, 2026
Operates one (1) wastewater treatment plant with a permitted annual average daily flow of 9.5 mgd and capacity of 10.45 mgd three month average daily flow (tmadf), approx. 420 miles of gravity sewer collection system, 197 wastewater lift stations, and about 40 miles of force mains which have been in service since the 1970s.
Operation and maintenance of the wastewater treatment plant at international airport which consists of the pump station, triturator, south ramp lift station, washrack, and management of the r1 reclaimed water and landscaping adjacent to the wastewater treatment plant and lift station.
Posted Date
Dec 19, 2025
Due Date
Jan 23, 2026
Release: Dec 19, 2025
Close: Jan 23, 2026
Operation and maintenance of the wastewater treatment plant at international airport which consists of the pump station, triturator, south ramp lift station, washrack, and management of the r1 reclaimed water and landscaping adjacent to the wastewater treatment plant and lift station.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis