Higher EducationTX
Aug 14, 2026
Closes
Sep 7, 2026
Hilton Hotel Underground Garage Structural Repairs FY26 REBID (Request for Proposals)
Hilton hotel underground garage structural repair.Stabilization of existing foundation system for the ramp to mitigate future movement. Perform concrete repairs, excavate and install 47 micropiles along the outside wall. Install another 15 micropile.