CityAR
Jul 26, 2026
Closes
Aug 18, 2026
McKissic Creek Streambank Restoration
Work includes streambank stabilization and restoration. Major work includes clearing and grubbing, excavation and grading, and installation of streambank protection measures such as rock revetments, cross vane structures, and in-stream boulder placements. Additional work includes implementation of temporary and permanent erosion control measures, site restoration. Description: 1 LS of mobilization, bonding, insurance; 1 LS of erosion control maintenance; 725 LF of tree preservation fencing; 2 ea of construction entrance; 1 LS of construction staking; 1 LS of removal of manmade materials from streambed and clearing and grubbing; 1 LS of trail protection matting or detour routing materials and signage; 630 CY of temporary diversion berm & channel - excavation and removal. See attached file.