The project will rehabilitate and construct pavement, curbs, gutters, and sidewalks on Contra Costa Street and Catalina Street, and install low-impact-development features including bioretention areas, permeable pavement, storm-drain inlets, pipes, and infiltration chambers. The improvements are intended to capture, treat, and infiltrate stormwater, reduce urban pollutants reaching Monterey Bay National Marine Sanctuary, and improve water quality. The City lists this as West End Stormwater Improvement Project Formal Bid 26-06, with bids due November 11, 2026, at 2:00 p.m.