The Meadows Boardwalk Trail Project (Design-Bid-Build) RFP
Posted
Oct 23, 2026
Nov 13, 2026
Construction of the boardwalk, footbridges, and overland trail on State Park” property. The trail includes 2956’ of overland trail at grade, 391’ of boardwalk, 206’ of footbridge, and 3 viewing platforms.
