CityOH
Posted
Sep 3, 2026
Oct 20, 2026
Stormwater Management Basin Retrofits Various Locations III RFP
Rehabilitation of stormwater management basin improvements at various subdivisions. Work will include erosion and sediment control measures, temporary by-pass pumping, dewatering, removal and disposal of accumulated sediment, removal and disposal of existing outlets structures and/or discharge pipes, placement of new outlet structures, discharge pipes and/or flared end sections, backfilling and regrading, raising existing emergency spillway elevations, stabilization of embankments and channels, removal of erosion control measures, and preparation of as-built plans. Stabilization of eroded areas around existing outlet structures/outfall pipes for six existing stormwater management basins is also included.