Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Derry Township (Hershey, Pennsylvania) is soliciting bids to remove and replace the existing culvert and roadway on Stauffers Church Road. The project includes installing a 60‑inch smooth‑lined corrugated plastic pipe depressed six inches into the streambed, precast winged endwalls, and riprap armoring per the advertisement. Bids are submitted online via PennBid and are due February 19, 2026 at 11:00 AM local time.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Culvert replacement.
Posted Date
-
Due Date
Feb 17, 2026
Release: -
Close: Feb 17, 2026
Culvert replacement.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consist of culvert replacement.
Posted Date
Jan 7, 2026
Due Date
Mar 4, 2026
Release: Jan 7, 2026
Close: Mar 4, 2026
Project consist of culvert replacement.
AvailableWork includes the replacement of a culvert, approx. 1300 feet. The existing dual elliptical pipe culvert will be replaced with a new, 4-sided box culvert. Additional work consists of watermain replacement and roadway approach reconstruction. An off-site detour will be utilized for the duration of construction.
Posted Date
Jan 9, 2026
Due Date
Feb 3, 2026
Release: Jan 9, 2026
Close: Feb 3, 2026
Work includes the replacement of a culvert, approx. 1300 feet. The existing dual elliptical pipe culvert will be replaced with a new, 4-sided box culvert. Additional work consists of watermain replacement and roadway approach reconstruction. An off-site detour will be utilized for the duration of construction.
AvailableRelease: Jan 9, 2026
Close: Jan 29, 2026
Culvert replacement project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →