CityOH
Posted
Nov 19, 2025
Sep 25, 2026
Sr-605 Utility Relocation Improvements - REBID 2
Work includes 1 LS clearing and grubbing; 30 CY existing manufactured soil removed and replaced with item 304; 6 EA mailbox removed and reset; 124,000 CY excavation; 241 SF 8" concrete walk; 1 EA monument box adjusted to grade; 135 LF construction fence; 210,000 EA erosion control; 1,099 SY erosion control mat, vegetated (eronet p300 or equal); 1,500 LF full depth pavement sawing; 3,593 SY pavement planing, asphalt concrete (1 1/2"); 5,143 SY aggregate base; 45 CY aggregate base; 12,365 SY 8" roller compacted concrete base; 496 CY non-tracking tack coat; 517 CY 1 1/2" asphalt concrete surface course, type 1, (446); 7 EA manhole adjusted to grade; 6 EA manhole.