Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of approximately 1,345,000 CY of excavation; 2,938 CY of structural fill; 684,000 SF of low permeability liner base, 684,700 SF of 60 mil HDPE geomembrane, and 668,000 SF of leachate collection layer; 2,586 LF of perforated 8" leachate collection pipe; 773 LF of solid 8" leachate pipe; 2 leachate sump station assemblies, sediment pond cleaning; 2,313 SY of all-weather access road; storm drains, and erosion and sedimentation control items.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Construction of the final cover system for Phase I Cells A, B, and C on approx. 25 acres at the Bedford County Landfill.
Posted Date
Nov 30, 2025
Due Date
Dec 18, 2025
Release: Nov 30, 2025
Close: Dec 18, 2025
Construction of the final cover system for Phase I Cells A, B, and C on approx. 25 acres at the Bedford County Landfill.
AvailableWork includes construction of a new landfill cell. Removal of the steel-framed storage structure. The metal storage structure and associated site improvements must be removed as part of this project. As part of this submittal, the county is seeking options for the removal of the building including demolition and disposal of the structure as well as the potential salvaging and bundling of the red steel for reuse. Includes 74,700 CY of general excavation cut (bank), includes overexcavate 6" in cell 3B area only; see attached files.
Posted Date
Dec 9, 2025
Due Date
Dec 30, 2025
Release: Dec 9, 2025
Close: Dec 30, 2025
Work includes construction of a new landfill cell. Removal of the steel-framed storage structure. The metal storage structure and associated site improvements must be removed as part of this project. As part of this submittal, the county is seeking options for the removal of the building including demolition and disposal of the structure as well as the potential salvaging and bundling of the red steel for reuse. Includes 74,700 CY of general excavation cut (bank), includes overexcavate 6" in cell 3B area only; see attached files.
The Bedford County Department of Solid Waste is soliciting bids to furnish all labor, materials, and equipment for construction of the final cover system for Phase I Cells A, B, and C across approximately 25 acres at the Bedford County Landfill. Project manual and drawings are available electronically on the County’s Finance Solicitation/vendor site; bidders must be properly registered and licensed in Virginia and not debarred. The solicitation is posted as an Invitation for Bids (IFB), was posted on 2025-12-11 and the response deadline is 2025-12-18.
Posted Date
Dec 11, 2025
Due Date
Dec 18, 2025
Release: Dec 11, 2025
Close: Dec 18, 2025
The Bedford County Department of Solid Waste is soliciting bids to furnish all labor, materials, and equipment for construction of the final cover system for Phase I Cells A, B, and C across approximately 25 acres at the Bedford County Landfill. Project manual and drawings are available electronically on the County’s Finance Solicitation/vendor site; bidders must be properly registered and licensed in Virginia and not debarred. The solicitation is posted as an Invitation for Bids (IFB), was posted on 2025-12-11 and the response deadline is 2025-12-18.
Qualified surveying and engineering consultants to furnish services for the 2026 City Regional Landfill Survey. Regional Landfill (CRL) reports annual waste volume changes that occur in all active landfill cells as required by the lifetime permit authorized by the Wyoming Department of Environmental Quality Solid and Hazardous Waste Division (WDEQ/SHWD). The reports allow the CRL and WDEQ/SHWD to monitor permitted air space used and to calculate remaining capacities through comparing the most recent annual topographic surveys to surveys from the previous year. The work of this request for proposals (RFP) includes topographic surveys of the CRL through aerial photogrammetric methods.
Posted Date
Dec 10, 2025
Due Date
Jan 5, 2026
Release: Dec 10, 2025
Close: Jan 5, 2026
Qualified surveying and engineering consultants to furnish services for the 2026 City Regional Landfill Survey. Regional Landfill (CRL) reports annual waste volume changes that occur in all active landfill cells as required by the lifetime permit authorized by the Wyoming Department of Environmental Quality Solid and Hazardous Waste Division (WDEQ/SHWD). The reports allow the CRL and WDEQ/SHWD to monitor permitted air space used and to calculate remaining capacities through comparing the most recent annual topographic surveys to surveys from the previous year. The work of this request for proposals (RFP) includes topographic surveys of the CRL through aerial photogrammetric methods.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis