Summary
Work includes 1 LS remove existing f curb & sidewalk from phase 1; 1 LS remove existing canal crossings including culverts; 1 LS remove existing corkscrew lake control str & 48" pipe; 1 LS remove existing ag lake control str & 24" rcp; 1 LS construction entrance/tracking control; 1 LS remove existing lake vegetation & loose silty sand from corkscrew lake bottom in lake ares not to be filled or excavated; 1 LS remove existing lake vegetation & loose silty sand from corkscrew lake bottom in lake ares to be filled; 32,650 SY bahia sod for canal/lake banks & maintenance path (remaining areas) ; 14,712 SY 12" stabilized subgrade - road & parking. See attached file.