Utah Department of Transportation
State AgencyUT
Posted
Sep 26, 2026
Oct 22, 2026
SR-77; Spanish Fork Main St to US-89 Springville
Work consists of 110,282 SY of micro-surfacing; 10 TON of type ii crack sealant; 176 TON of micro cqs-1p; 61 CY of asphalt pavement soft spot repair - contingency item; 2,771 SF of reconstruct pedestrian access ramp remove sidewalk; 430 ft of reconstruct pedestrian access ramp remove curb & gutter; 1,260 SF of reconstruct pedestrian access ramp remove asphalt; 430 ft of reconstruct pedestrian access ramp curb & gutter; 1,260 SF of reconstruct pedestrian access ramp asphalt; 593 gal of pavement marking paint; 3,405 ft of pavement message (preformed thermoplastic stop line, crosswalks - 12"); 382 ft of pavement message (preformed thermoplastic stop line, crosswalks - 24"); 57 SF of sign type a-1; 137 SF of sign type a-2.