CityOH
Posted
Nov 2, 2026
Nov 18, 2026
Wastewater Treatment Plant Phase 2 Blower Replacement Project RFP
Work inlcudes wastewater treatment plant blower replacement.
Description: Work consists of installation of a new 12" HDPE waterline along canyon road from the end of phase 1 to the last spring on the system. The existing springs along the project length will be tied into the new line.
City · UT, US
Decision makers connected to this RFP from City of Smithfield.
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityOH
Posted
Nov 2, 2026
Nov 18, 2026
Work inlcudes wastewater treatment plant blower replacement.
Greenville Utilities Commission
Special DistrictNC
Posted
-
Nov 19, 2026
Replacement of 12. 47 kv distribution structures along the grid phase 2. This specification covers the installation, removal, transfers, and materials of 287 distribution structures along the grid. Any costs associated with guying, anchors, and service transfers should be included in the pole-top assembly cost. Old distribution structures along the grid will be replaced with new poles. The existing structures will be removed. All transfers are the responsibility of the contractor. Existing conductors will be attached to new poles. Existing copper neutral conductor running along w longmeadow road will be replaced with 1/0 acsr conductor. Old existing switches and transformers will be replaced including associated ground connections. All hardware and insulators will be replaced. The proposal submitted by the contractor shall include all labor, equipment, and all other necessary items to complete this project.
Moraine Valley Community College
Higher EducationIL
Posted
Nov 2, 2026
Nov 23, 2026
The work located in Building F includes the demolition of an existing air handling unit, associated piping, ductwork, controls and electrical and the installation of a new air handling unit, piping, controls, ductwork and associated electrical. Two alternates are being considered which would provide a longer warranty period for the AHU and the replacement of existing pneumatically controlled terminal air boxes that serve the theater area with new digitally controlled terminal air boxes.
Wisconsin Department of Administration
State AgencyWI
Posted
Nov 3, 2026
Dec 17, 2026
In general, the work consists of: site clearing, removing reinforced concrete pavement, removing and reinstalling pipe bollards, removing and replacing security fencing and gates, slope stabilization, installing a trench drain and sanitary sewer, removing and replacing storm sewer inlet and castings, constructing a dual level loading dock and mechanical dock leveler with railings, placing base course material, placing curb and gutter, placing reinforced concrete, and other miscellaneous items of work.