Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consist of approx 975 SY of 0.5" Asphalt Mill; 650 SY of 20" aggregate base course; 75 SY of 4" topsoil placement and grading; 310 LF of concrete curb and cutter; 10 LF of 1" water service line. See outsude link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work consists of construction of 2,042 LF of 10" diameter waterline, 60 LF of 12” diameter waterline, connections to existing waterlines, valves, fire hydrants, and abandonment of existing waterline and valves.
Posted Date
Nov 25, 2025
Due Date
Feb 3, 2026
Release: Nov 25, 2025
Close: Feb 3, 2026
Work consists of construction of 2,042 LF of 10" diameter waterline, 60 LF of 12” diameter waterline, connections to existing waterlines, valves, fire hydrants, and abandonment of existing waterline and valves.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 172 CY of unclassified excavation; 262 CY of compacted embankment, select fill; 208 TN of aggregate base course (class 7); 125 TN of achm surface course; 526 SF of concrete driveway (6" thick), standard finish; 710 LF of concrete curb & gutter (class 3); 102 lf of storm drain pipes, 15" side drain; 23 LF of storm drain pipes, 18" cross drain; 823 SY of solid sodding, bermuda; 4 EA of wing 3' extension; 2 EA of wing 3' extension; 2 EA of curb inlet - 4' box; 730 LF of silt fence - type a (sfa); etc, see attached file.
Posted Date
Jan 8, 2026
Due Date
Jan 29, 2026
Release: Jan 8, 2026
Close: Jan 29, 2026
Work includes 172 CY of unclassified excavation; 262 CY of compacted embankment, select fill; 208 TN of aggregate base course (class 7); 125 TN of achm surface course; 526 SF of concrete driveway (6" thick), standard finish; 710 LF of concrete curb & gutter (class 3); 102 lf of storm drain pipes, 15" side drain; 23 LF of storm drain pipes, 18" cross drain; 823 SY of solid sodding, bermuda; 4 EA of wing 3' extension; 2 EA of wing 3' extension; 2 EA of curb inlet - 4' box; 730 LF of silt fence - type a (sfa); etc, see attached file.
AvailableMill and resurface, epoxy overlay, deck repairs, lighting replacements for the two structures, overhead sign structure, updating signage, design build ADA curb ramps, tree trimming, guiderail, line painting, and other miscellaneous construction.
Posted Date
Dec 15, 2025
Due Date
Jan 29, 2026
Release: Dec 15, 2025
Close: Jan 29, 2026
Mill and resurface, epoxy overlay, deck repairs, lighting replacements for the two structures, overhead sign structure, updating signage, design build ADA curb ramps, tree trimming, guiderail, line painting, and other miscellaneous construction.
AvailableThe project consists of water line replacement (open cut and directional bore), concrete roadway, sidewalk, and driveway removal and replacement.
Posted Date
Dec 17, 2025
Due Date
Jan 27, 2026
Release: Dec 17, 2025
Close: Jan 27, 2026
The project consists of water line replacement (open cut and directional bore), concrete roadway, sidewalk, and driveway removal and replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →