Universal mill - 10 hp horizontal spindle motor, 12 speed ranges(40-1800rpm) - 13.7" x 72.8" hardened and ground table top - saddle and knee with hardened and ground square (box) ways - table swivels ? 45 degrees left & right - meehanite casting body gc-45/din-40 - x,y and z axis are variable speed with inverter by gearbox - rapid traverse on x, y and z axis - all gears and shafts are hardened and ground - extra wide square cross and knee ways and dovetail longitudinal ways for enhanced rigidity dro system (2-axis, 0. 0002" resolution) coolant (1 gallon, mixes 1:30) angle-lock vise (6") angle-lock vise (8") rotary table (12", vertical and horizontal) clamping kit (52 pc) nmtb #50 shank er-40 collet chuck system (9 pc) -440v power -ce upgrade electrics -csa upgrade electrics "kent usa" #kum-2500um.
Universal mill - 10 hp horizontal spindle motor, 12 speed ranges(40-1800rpm) - 13.7" x 72.8" hardened and ground table top - saddle and knee with hardened and ground square (box) ways - table swivels ? 45 degrees left & right - meehanite casting body gc-45/din-40 - x,y and z axis are variable speed with inverter by gearbox - rapid traverse on x, y and z axis - all gears and shafts are hardened and ground - extra wide square cross and knee ways and dovetail longitudinal ways for enhanced rigidity dro system (2-axis, 0. 0002" resolution) coolant (1 gallon, mixes 1:30) angle-lock vise (6") angle-lock vise (8") rotary table (12", vertical and horizontal) clamping kit (52 pc) nmtb #50 shank er-40 collet chuck system (9 pc) -440v power -ce upgrade electrics -csa upgrade electrics "kent usa" #kum-2500um.
Project will include, but is not limited to, the following: ●Removal and disposal of remaining roof covering materials and flashing, where noted in the documents ●Stabilization and patching of the concrete roof deck, including treatment of exposed underlying rebar. ●Selective removal and reinstallation of historic mechanical elements on the roofs. ●Rehabilitation of the headhouse windows including repair or replacement of original steel sashes, installing new polycarbonate glazing, and installing new steel security screens.●Supply and installation of new roof coverings according to drawings and specifications.
Project will include, but is not limited to, the following: ●Removal and disposal of remaining roof covering materials and flashing, where noted in the documents ●Stabilization and patching of the concrete roof deck, including treatment of exposed underlying rebar. ●Selective removal and reinstallation of historic mechanical elements on the roofs. ●Rehabilitation of the headhouse windows including repair or replacement of original steel sashes, installing new polycarbonate glazing, and installing new steel security screens.●Supply and installation of new roof coverings according to drawings and specifications.
The Maryland Department of Transportation State Highway Administration (MDOT SHA) issued a public notice for milling, grinding, patching, and resurfacing asphalt pavement at multiple locations in Kent and Queen Anne’s Counties. Electronic bids must be submitted through Bid Express and contracts over $100,000 require bid security and payment/performance bonds; work has phased completion windows with portions required to be completed by June 30, 2026 and other work between July 1, 2026 and December 1, 2026. The solicitation was posted 2026-01-21 and has a response deadline of 2026-02-26, and is not a grant.
The Maryland Department of Transportation State Highway Administration (MDOT SHA) issued a public notice for milling, grinding, patching, and resurfacing asphalt pavement at multiple locations in Kent and Queen Anne’s Counties. Electronic bids must be submitted through Bid Express and contracts over $100,000 require bid security and payment/performance bonds; work has phased completion windows with portions required to be completed by June 30, 2026 and other work between July 1, 2026 and December 1, 2026. The solicitation was posted 2026-01-21 and has a response deadline of 2026-02-26, and is not a grant.