Jul 23, 2026
Closes
Aug 19, 2026
South Water Plant Silos Rehabilitation
The work includes removal and disposal of (4) existing dust collectors on the roof of the south water treatment plant and installation of new dust collectors, compressor and dryer, pressure relief valves, piping, and associated electrical facilities and controls and other appurtenant and related items of construction. The work also includes modifications to an existing crane system including foundation modifications, installation of frames, removal of the existing coiling door and replacing with a double door.