CityMO
Posted
Oct 1, 2026
Nov 11, 2026
South Main Trail Connection Project
The Work consists of Construction of approximately 570 LF of new 10-foot-wide concrete trail from existing trail and connecting to existing sidewalk.
Description: The Work consists of Construction of approximately 570 LF of new 10-foot-wide concrete trail from existing trail and connecting to existing sidewalk.
City · MO, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
CityMO
Posted
Oct 1, 2026
Nov 11, 2026
The Work consists of Construction of approximately 570 LF of new 10-foot-wide concrete trail from existing trail and connecting to existing sidewalk.
Nodaway County Sheriff's Office
Police DepartmentMO
Posted
Oct 2, 2026
Nov 11, 2026
Work consists of construction of approx 570 LF of new 10-foot-wide concrete trail from existing trail at the north side of mosaic medical center (west end of new trail) and connecting to existing sidewalk at south main street (east end of new trail).
CityPA
Posted
Oct 5, 2026
Nov 20, 2026
A public trail and park access development project that includes: the construction of several 6' wide asphalt trail spurs, at grade in existing mowed areas; metal benches on concrete pads; kiosk signage; aluminum fencing; picnic tables; trash receptacles; bollards; funding designation signage; a flag pole with concrete footing; tree plantings; curb cuts required erosion and sediment control best management practices; and the rehabilitation/repairs of an existing bridge (trellis) and installation of steel fencing.
CityMO
Posted
Sep 29, 2026
Oct 27, 2026
This project will consist of construction of a multiuse trail in the community. The project will include grading, concrete trail pavement, pedestrian facilities, sidewalk curb ramps, and drainage improvements.
Decision makers connected to this RFP from City of Maryville.