South Beaches WWTF BNR and Sludge Holding Tank and Biosolids Dewatering Improvements RFP
The project includes removing existing aeration blowers, air diffusors, electrical equipment, piping, conduits, belt filter presses, polymer feed systems, sludge feed pumps, and associated pipework as necessary; installing new aeration blowers, recycle pumps, air diffusors, a compressed gas mixing system, jet aeration system, chemical facilities, screw presses, sludge press feed pumps, and a polymer blending unit; refurbishing the existing bridge crane; and performing all required architectural, structural, mechanical, and electrical renewal and replacement work.