FederalCA
Posted
Nov 10, 2026
Nov 18, 2027
Sources Sought: Smart T Power Project
The installation of power run from Building 1470 Room 126 to Electrical Panel RP15 and existing red PDU. The contractor shall label all new conduits, junction boxes, and breaker panel circuits according to ANSI/TIA-606-C standards or, if no standard is specified, with professional, machine-printed labels detailing the power source and circuit ID.
