Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Scope of Work for Lighting: Each batten will have individual motorized control for raising and lowering; Batten motor controls will be located on the “stage right” wall; Each batten will have 5 quad outlet L5-20 receptacles spaced evenly across the batten using SO cord with L5-20P plugs on each end; All lighting rails / battens rigging to be professionally installed with GAK Flex with shackles and clamps to IASTE and OSHA safety standards and load ratings; Lighting package to include all costs associated with existing equipment removal, materials, Scope of Work for Sound: All sound reinforcement elements to be professionally flown to IASTE and OSHA safety standards and load ratings; Audio package to include all costs associated with existing equipment removal, materials, configuration, installation, programming and training. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The project consists of, but is not limited to, one-for-one lighting replacement of fixtures and control system for the Theater and Concert Hall. Analog audio system shall be replaced and updated with an AV/IP solution. Audio input devices to be updated and replaced with new. Analog intercom system to be replaced with an updated IP theater intercom system for the Theater and Concert Hall. Refer
Posted Date
Nov 24, 2025
Due Date
Dec 16, 2025
Release: Nov 24, 2025
Close: Dec 16, 2025
The project consists of, but is not limited to, one-for-one lighting replacement of fixtures and control system for the Theater and Concert Hall. Analog audio system shall be replaced and updated with an AV/IP solution. Audio input devices to be updated and replaced with new. Analog intercom system to be replaced with an updated IP theater intercom system for the Theater and Concert Hall. Refer
AvailableSound system upgrade.
Posted Date
Dec 4, 2025
Due Date
Jan 15, 2026
Release: Dec 4, 2025
Close: Jan 15, 2026
Sound system upgrade.
AvailableCentral Middle School building lighting upgrade.
Posted Date
Nov 17, 2025
Due Date
Dec 18, 2025
Release: Nov 17, 2025
Close: Dec 18, 2025
Central Middle School building lighting upgrade.
AvailableBaseball and softball field lighting system upgrade.
Posted Date
Oct 13, 2025
Due Date
Dec 16, 2025
Release: Oct 13, 2025
Close: Dec 16, 2025
Baseball and softball field lighting system upgrade.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis