E Unit, Shower Replacement/Increase Ventilation
Aug 5, 2026
Closes
Aug 26, 2026
E unit, shower replacement/increase ventilation. Project Work includes remodeling portions of a single-story pre-engineered metal building currently in use as a dormitory for part of a detention facility. Scope includes the replacement of exterior and interior vestibule doors as well as a remodel of the shower facilities to improve ventilation and update facility to current accessibility, safety, and anti-ligature standards. Affected floor area is roughly 620 square feet and includes alternates for replacement of toilet partitions and fixtures. See attached file.
