Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Drain line extension.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes 4100 SY of subgrade preparation; minor paving type i, hma sp-iv; 27 CY of structural concrete, class aa; 6060 lb of reinforcing bars grade 60; 89 LF of 18" storm drain culvert pipe; 150 SY of concrete sidewalk 4" ; 4 ea manhole type c-6' diameter 0' to 6' depth; 140 LF of steel posts and base posts for construction signing. See attached file.
Posted Date
Dec 11, 2025
Due Date
Jan 28, 2026
Release: Dec 11, 2025
Close: Jan 28, 2026
Work includes 4100 SY of subgrade preparation; minor paving type i, hma sp-iv; 27 CY of structural concrete, class aa; 6060 lb of reinforcing bars grade 60; 89 LF of 18" storm drain culvert pipe; 150 SY of concrete sidewalk 4" ; 4 ea manhole type c-6' diameter 0' to 6' depth; 140 LF of steel posts and base posts for construction signing. See attached file.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Palmdale seeks a qualified consultant to provide construction management and observation services for the 45th Street Sewer, Storm Drain and Street Renovation Project, including constructability review, construction observation, materials testing, and public outreach. The work includes installation of a new storm drain system, associated street improvements, and an 18-inch sewer relief line with an estimated project value of $7.5M–$7.6M. The project is expected to start in March 2026 and be completed by Spring 2027.
Posted Date
Dec 11, 2025
Due Date
Jan 15, 2026
Release: Dec 11, 2025
Close: Jan 15, 2026
The City of Palmdale seeks a qualified consultant to provide construction management and observation services for the 45th Street Sewer, Storm Drain and Street Renovation Project, including constructability review, construction observation, materials testing, and public outreach. The work includes installation of a new storm drain system, associated street improvements, and an 18-inch sewer relief line with an estimated project value of $7.5M–$7.6M. The project is expected to start in March 2026 and be completed by Spring 2027.
AvailableWork includes approx. 217 LF of jack and bore roadway crossing with 26" casing, complete excluding carrier pipe; 289 LF of jack and bore railroad crossing with 26" casing, complete excluding carrier pipe; 2,540 LF of 16" ductile iron slip joint pipe, class 250, for waterline replacement; 1,120 LF ductile iron slip joint pipe, class 250, for waterline replacement; 500 SY of concrete pavement replacement for open cut; 580 SY of asphalt pavement replacement for open cut; 500 LF of silt fence; 200 LF of wattle installation and removal; see outside link for more details.
Posted Date
Nov 15, 2025
Due Date
Jan 15, 2026
Release: Nov 15, 2025
Close: Jan 15, 2026
Work includes approx. 217 LF of jack and bore roadway crossing with 26" casing, complete excluding carrier pipe; 289 LF of jack and bore railroad crossing with 26" casing, complete excluding carrier pipe; 2,540 LF of 16" ductile iron slip joint pipe, class 250, for waterline replacement; 1,120 LF ductile iron slip joint pipe, class 250, for waterline replacement; 500 SY of concrete pavement replacement for open cut; 580 SY of asphalt pavement replacement for open cut; 500 LF of silt fence; 200 LF of wattle installation and removal; see outside link for more details.
AvailableWorks include approx. 1 LS seeding and mulching; 5,788 LF of 16" PVC (C900, DR-18) directionally bored; 1,000 LF of 8" PVC (C900, DR-18) w/ compacted native backfill. See outside link.
Posted Date
Dec 8, 2025
Due Date
Jan 15, 2026
Release: Dec 8, 2025
Close: Jan 15, 2026
Works include approx. 1 LS seeding and mulching; 5,788 LF of 16" PVC (C900, DR-18) directionally bored; 1,000 LF of 8" PVC (C900, DR-18) w/ compacted native backfill. See outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.