Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 700 SF of temporary signs; 200 SY of base failure repair; 150 LF of conduit-1 1/4 in; 20 LF of conduit-2 in; 145 LF of trenching and backfilling; 5,200 LF of loop wire; 95,000 LF of pave striping removal-6 in; 60,000 LF of pave striping-thermo-6 in w; 5,013 LF of pave marking-thermo x-walk-12 in; 1,300 SF of pave marking-thermo cross-hatch; 1,708 LF of pave mark temp paint stop bar-24 in; 190,000 LF of pave striping-temp paint-4 in; 164,901 SY of microsurfacing-surface course - type a and associated works.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide professional engineering consultant to provide cei services for construction of free-flow interchange, 1.4 miles of us 27 reconstruction, eight (8) new bridges, drainage, lighting, its, signing and pavement markings, and in-road electric vehicle charging pilot.
Posted Date
Jul 2, 2025
Due Date
Jan 28, 2026
Release: Jul 2, 2025
Close: Jan 28, 2026
Provide professional engineering consultant to provide cei services for construction of free-flow interchange, 1.4 miles of us 27 reconstruction, eight (8) new bridges, drainage, lighting, its, signing and pavement markings, and in-road electric vehicle charging pilot.
AvailableWork consists of milling the existing asphaltic concrete pavement and replacing it with stone matrix asphalt and/or asphaltic concrete. The work also includes removing and replacing the guardrail and embankment curb, shoulder buildup, drainage improvements, bridge crack repair, installation of rumble strips, applying seeding, placing riprap, and installation of signs, pavement marking, and other related work. Work will also includes 780 LF of removal of curing compound for striping; 139,188 LF of waterborne-type i pavement marking (painted) (white); 106,262 LF of waterborne-type i pavement marking (painted) (yellow); 69,594 LF of dual component pavement marking (white Epoxy); 35,030 LF of erosion control (wattles) (9"); 2,485 SY of miscellaneous work (median crossover Treatment (ac millings)); 11,190 TON of miscellaneous work (stone matrix asphaltic ton concrete). See attached files.
Posted Date
Nov 7, 2025
Due Date
Feb 13, 2026
Release: Nov 7, 2025
Pavement repair services for US Route 60 between Wickenburg and Morristown, including milling, AC pavement replacement, and pavement markings.
Posted Date
Dec 5, 2025
Due Date
Jan 30, 2026
Release: Dec 5, 2025
Close: Jan 30, 2026
Pavement repair services for US Route 60 between Wickenburg and Morristown, including milling, AC pavement replacement, and pavement markings.
AvailableRoad Resurfacing (Sealant/Pavement Restoration/Curbing).
Posted Date
Dec 1, 2025
Due Date
Jan 21, 2026
Release: Dec 1, 2025
Close: Jan 21, 2026
Road Resurfacing (Sealant/Pavement Restoration/Curbing).
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of milling the existing asphaltic concrete pavement and replacing it with stone matrix asphalt and/or asphaltic concrete. The work also includes removing and replacing the guardrail and embankment curb, shoulder buildup, drainage improvements, bridge crack repair, installation of rumble strips, applying seeding, placing riprap, and installation of signs, pavement marking, and other related work. Work will also includes 780 LF of removal of curing compound for striping; 139,188 LF of waterborne-type i pavement marking (painted) (white); 106,262 LF of waterborne-type i pavement marking (painted) (yellow); 69,594 LF of dual component pavement marking (white Epoxy); 35,030 LF of erosion control (wattles) (9"); 2,485 SY of miscellaneous work (median crossover Treatment (ac millings)); 11,190 TON of miscellaneous work (stone matrix asphaltic ton concrete). See attached files.
Available