Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of West Valley City
Work consist of replace eight softball scoreboards at park. Spec, eight outdoor softball scoreboards to fit on existing mounting poles (6" square mounting poles, 8 feet apart at center of poles, bottom of scoreboard at 12', power requirements 120v); display should be no less than 15" LED digits.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Columbia School District 93
Work includes replacement and installation of a gymnasium video scoreboard system at high school. This RFP is the first in a multi-year project that may include two additional high schools in subsequent phases. Also includes remove and disposal: safely remove and dispose of existing scoreboard and associated components; see outside link.
Posted Date
Nov 12, 2025
Due Date
Dec 11, 2025
Release: Nov 12, 2025
Columbia School District 93
Close: Dec 11, 2025
Work includes replacement and installation of a gymnasium video scoreboard system at high school. This RFP is the first in a multi-year project that may include two additional high schools in subsequent phases. Also includes remove and disposal: safely remove and dispose of existing scoreboard and associated components; see outside link.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Fairfield County School District
Removal, disposal of the existing scoreboard, as well as the installation of a new outdoor scoreboard system.
Posted Date
Nov 3, 2025
Due Date
Dec 2, 2025
Release: Nov 3, 2025
Fairfield County School District
Close: Dec 2, 2025
Removal, disposal of the existing scoreboard, as well as the installation of a new outdoor scoreboard system.
AvailableCity of Dade City
Seeking a qualified contractor to provide inspection, assessment, repair, and replacement services for the stormwater pump station. Work includes ensuring operational reliability, identifying deficiencies, performing repairs or replacements as needed, and restoring full functionality. Remove the two turbine pumps and motors and transport to an approved facility for teardown and detailed assessment. Inspect pump components including: engine/motor, impeller, shaft, bearings, stuffing boxes, bowls, seals, and couplings. Provide written findings, including recommendations for repair, replacement, or re-use of components. Advise city if some components do not need replacement to adjust schedule and cost. Remove all existing control wires, panel, conduit, floats, generator receptacles, switches, mounting hardware, and miscellaneous items. See outside link.
Posted Date
Nov 2, 2025
Due Date
Dec 11, 2025
Release: Nov 2, 2025
City of Dade City
Close: Dec 11, 2025
Seeking a qualified contractor to provide inspection, assessment, repair, and replacement services for the stormwater pump station. Work includes ensuring operational reliability, identifying deficiencies, performing repairs or replacements as needed, and restoring full functionality. Remove the two turbine pumps and motors and transport to an approved facility for teardown and detailed assessment. Inspect pump components including: engine/motor, impeller, shaft, bearings, stuffing boxes, bowls, seals, and couplings. Provide written findings, including recommendations for repair, replacement, or re-use of components. Advise city if some components do not need replacement to adjust schedule and cost. Remove all existing control wires, panel, conduit, floats, generator receptacles, switches, mounting hardware, and miscellaneous items. See outside link.
AvailableCity of Mercedes
Provide qualified contractors to replace flooring at city hall (9,769 SF ) with one of the following options: polished sealed concrete, ceramic/porcelain/natural stone tile, or luxury vinyl tile (LVT).
Posted Date
Oct 28, 2025
Due Date
Dec 3, 2025
Release: Oct 28, 2025
City of Mercedes
Close: Dec 3, 2025
Provide qualified contractors to replace flooring at city hall (9,769 SF ) with one of the following options: polished sealed concrete, ceramic/porcelain/natural stone tile, or luxury vinyl tile (LVT).
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →