Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Hilo Medical Center
Work consists of generator replacement project. Provide a full replacement and upgrade the existing primary power distribution (main switchboard). Scope includes decommissioning of the existing emergency generator, selective demolition of unused conductors and conduit, fuel pumps, exhaust pipes, disposal of oil, fuel and any other chemicals.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Tri-Dam Power Authority
The Tri-Dam Project seeks a qualified solar contractor to plan and install a solar panel array with a propane Generac-brand generator backup to replace the existing power system at Donnells Dam. Work includes decommissioning existing equipment, installation and commissioning of electrical and propane plumbing systems, and delivery of drawings and documentation; the project is expected to begin Jan–Feb 2026 (weather-permitting).
Posted Date
Oct 28, 2025
Due Date
Dec 2, 2025
Release: Oct 28, 2025
Tri-Dam Power Authority
Close: Dec 2, 2025
The Tri-Dam Project seeks a qualified solar contractor to plan and install a solar panel array with a propane Generac-brand generator backup to replace the existing power system at Donnells Dam. Work includes decommissioning existing equipment, installation and commissioning of electrical and propane plumbing systems, and delivery of drawings and documentation; the project is expected to begin Jan–Feb 2026 (weather-permitting).
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Forsyth County
Progressive DESIGN/BUILD services: Significant cutting, off site hauling and disposal of spoil material, and regrading of the existing soil pile covering the majority of the planned generator facility. Site drainage and stormwater management improvements needed to accommodate the additional impervious surface created as result of this project. One 2500kW, 12.47kV generator at the electric utility service point; it is anticipated the generator will operate 18MGD of conventional filters and 6MGD of membrane process trains (total 24 MGD) and two 700 HP high service pumps (4.16kV, 9 MGD capacity each, for 18 MGD total of pumping capacity). The design builders engineer will coordinate with owner to identify load shed scheme and determine what will happen when plant is on generator power. See attached file.
Posted Date
Oct 23, 2025
Due Date
Dec 11, 2025
Release: Oct 23, 2025
Forsyth County
Close: Dec 11, 2025
Progressive DESIGN/BUILD services: Significant cutting, off site hauling and disposal of spoil material, and regrading of the existing soil pile covering the majority of the planned generator facility. Site drainage and stormwater management improvements needed to accommodate the additional impervious surface created as result of this project. One 2500kW, 12.47kV generator at the electric utility service point; it is anticipated the generator will operate 18MGD of conventional filters and 6MGD of membrane process trains (total 24 MGD) and two 700 HP high service pumps (4.16kV, 9 MGD capacity each, for 18 MGD total of pumping capacity). The design builders engineer will coordinate with owner to identify load shed scheme and determine what will happen when plant is on generator power. See attached file.
AvailableWalker County
Work includes installation of both fixed and portable generators.
Posted Date
Nov 19, 2025
Due Date
Jan 5, 2026
Release: Nov 19, 2025
Walker County
Close: Jan 5, 2026
Work includes installation of both fixed and portable generators.
AvailableMaryland Motor Vehicle Administration
The project involves the replacement of generators and automatic transfer switches (ats). Including selective demolition, removal of existing equipment, installation of new generators and ats, associated electrical and mechanical work, and restoration of affected areas.
Posted Date
Oct 2, 2025
Due Date
Dec 1, 2025
Release: Oct 2, 2025
Maryland Motor Vehicle Administration
Close: Dec 1, 2025
The project involves the replacement of generators and automatic transfer switches (ats). Including selective demolition, removal of existing equipment, installation of new generators and ats, associated electrical and mechanical work, and restoration of affected areas.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →