CityON
Posted
Nov 6, 2026
Nov 27, 2026
Snake Creek Pedestrian Bridge
See bid documents for more information
Description: Work includes approx 2,490 LF 42" HDPE DR-11 water main by directional bore; 150 LF 36" steel water main by open cut; connection of the new 42" HDPE water main and 36" steel main to the existing 36" steel water main.
SpecialDistrict · FL, US
From the first pre-RFP signals to the published RFP and its files.
Board meeting
212 days before RFP
FKAA's February 2026 commitment summary listed the Snake Creek Crossing as awaiting grant funding under a $7.5 million budget.
Capital Projecis Commitment Summary Feb-26 Project Name Project Phase Budget Commitment Actual Remaining Facilities Marathon Customer Service Sije Development Permitting 500,000 s 155,011 s 148,502 s 6,509 Subtotal- Facilities 500,000 $ 155,011 $ 148,502 $ 6,509 Water Supply and Treatment PFAS Treatment at J Robert Oean Design 100,000,000 s 4,192,895 s…
Florida Keys Aqueduct Authority Regular Meeting Agenda
Board meeting · Mar 3, 2026
Board meeting
177 days before RFP
The proposed FY2027 capital budget lists $6.3 million for the Transmission Snake Creek Crossing (Directional Drill) in 2027 and 2028.
Introduction The 2027 proposed budget includes an overall operating increase of 1.8% A 2.5% CPI adjustment is estimated for June 2027 The Capital Plan totals $63.7 million Approximately 43% of CIP funding is supported through grants An additional 5.5% adjustment is included to fund multi- year critical capital projects 3. IS u·1 .,1 · , 1 M.Appell u l1ck…
Board meeting
86 days before RFP
The FKAA Board approved a $3,850 change order with Ardurra for the Snake Creek transmission-main crossing project.
CONSENT AGENDA WATER /WASTEWATER On motion of Mr. Gonzalez, seconded by Mrs. Sterling, the Board unanimously approved the following items by Consent. 1. DOE - 01. Approval of Change Order No. 02 for Transmission Main Crossing- Snake Creek (FKAA Project No. 1155-17) with Ardurra Group, Inc. to increase contract (in the amount of $3,850.)
Florida Keys Aqueduct Authority Regular Meeting
Board meeting · Jul 7, 2026
Agenda packet
58 days before RFP
FKAA's budget and financial plan lists a new Snake Creek subaqueous transmission crossing, with design and permits complete, a $6.3 million 2027 construction cost, and advertising deferred until grant execution.
Transmission Snake Creek Subaqueous Crossing Project Information Location Project Type Category Project Number Design Engineer Project Manager Contractor Start Date Completion Date Snake Creek Water Renewal and Replacement 1155-17 Ardurra Emmy Koenig McDowell To Be Determined 2023 2027 Description/Justification: Transmission The 30-inch water transmission…
Florida Keys Aqueduct Authority Board Of Directors Meeting
Agenda packet · Aug 4, 2026
RFP published
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalProposals due (10 days left)
Florida Keys Aqueduct Authority Board Of Directors' Meeting
Board meeting · Apr 7, 2026
Decision makers connected to this RFP from Florida Keys Aqueduct Authority.
Adjacent opportunities open for bidding right now.
CityON
Posted
Nov 6, 2026
Nov 27, 2026
See bid documents for more information
CityIL
Posted
Oct 21, 2026
Nov 18, 2026
Water main improvements. Scope of work includes - 100 EA tree root pruning; 32 EA tree trunk protection; 32 EA tree protective fencing; 56 EA inlet filters; 40 HR exploratory excavation; 1 LS sodding, special; 150 CY removal and disposal of contaminated soil; 1,000 TN cold-mix asphalt; see attached file.
Pennsylvania Department of Transportation
State AgencyPA
Posted
Nov 2, 2026
Dec 3, 2026
The solicitation covers an 800-linear-foot bridge rehabilitation project. Work includes bridge rehabilitation, roadway milling and resurfacing, and full-depth pavement. It also includes slope embankment reconstruction and guide rail replacement.
CityTX
Posted
-
Nov 17, 2026
The construction of approx. 4 sanitary sewer reroutes in 4 areas across the city including approx. 1,722 LF of pipe replacement by open cut, approx. 140 LF of steel encasement by open cut, construction of 15 manholes, geopolymer manhole lining, lateral reconnections, pavement repairs, and associated gravity sewer appurtenances, 1,810 LF of Post-Construction CCTV Inspection; 10 LF of Remove and Dispose Existing Sewer Line; 121 LF of Fill 10” Gravity Sewer Line with Grout; 350 LF of Fill 12” Gravity Sewer Line with Grout; 40 LF of 6" SDR 26 PVC Gravity Sewer Line; 500 LF of 8" SDR 26 PVC Gravity Sewer Line; 347 LF of 12" SDR 26 PVC Gravity Sewer Line; 80 LF of 10" SDR 26 PVC by Wet Bore; 34 LF of 12" Class 350 P401 Lined DI Gravity Sewer Line.