Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Stafford County
Work includes : replace the existing raw water magnetic flow meter installed in the existing raw water valve vault v-1; replace the five existing superpulsator clarifier vacuum pumps and associated piping and valves installed on the top of the two vacuum chambers serving clarifiers 1 through 4; demolish the existing outdoor fluoride storage tank and miscellaneous pads within the existing combined fluoride and caustic soda containment structure. Also demolish the indoor fluoride transfer pumps, day tank, scale, metering pumps and associated piping; see attached file.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Waycross
Wastewater Treatment Facility Upgrades – Phase 2 is described briefly as follows: In general, construction shall consist of conversion of sludge digester #2 to an aerobic digester. Removal of the digester roof, complete clean out, and installation of new mixing and aeration equipment along with slabs, piping, electrical, and controls for a working aerobic digester. Additional plant work shall include a new stairwell, plant by-pass pumping connection, and rehabilitation of the primary clarifier influent lines.
Posted Date
Sep 26, 2025
Due Date
Dec 5, 2025
Release: Sep 26, 2025
City of Waycross
Close: Dec 5, 2025
Wastewater Treatment Facility Upgrades – Phase 2 is described briefly as follows: In general, construction shall consist of conversion of sludge digester #2 to an aerobic digester. Removal of the digester roof, complete clean out, and installation of new mixing and aeration equipment along with slabs, piping, electrical, and controls for a working aerobic digester. Additional plant work shall include a new stairwell, plant by-pass pumping connection, and rehabilitation of the primary clarifier influent lines.
AvailableNew York Dormitory Authority
College Haaren Hall Natatorium Mechanical Room and Water Heater Phase II Upgrades.
Posted Date
Nov 12, 2025
Due Date
Dec 10, 2025
Release: Nov 12, 2025
New York Dormitory Authority
Close: Dec 10, 2025
College Haaren Hall Natatorium Mechanical Room and Water Heater Phase II Upgrades.
AvailableCity of Sturgeon
Project generally consists of, but is not limited to providing all labor, equipment, materials, supplies, tools and supervision necessary to replace lift station pumps, controls, and other appurtenances as necessary, perform minor plumbing/piping revisions to the existing force main just outside the valve chamber, and coordinate with electric utility to upgrade the existing single phase electric service to 3-phase.
Posted Date
Nov 5, 2025
Due Date
Nov 25, 2025
Release: Nov 5, 2025
City of Sturgeon
Close: Nov 25, 2025
Project generally consists of, but is not limited to providing all labor, equipment, materials, supplies, tools and supervision necessary to replace lift station pumps, controls, and other appurtenances as necessary, perform minor plumbing/piping revisions to the existing force main just outside the valve chamber, and coordinate with electric utility to upgrade the existing single phase electric service to 3-phase.
AvailableCity of Casa Grande
The City of Casa Grande, Arizona, is seeking bids for security upgrades at its Water Reclamation Facility. The project involves the procurement, installation, integration, and testing of security systems, including access control panels, CCTV cameras, door and vehicle gate security hardware, and area lighting. Contractors must demonstrate relevant experience and certifications, including being a Verkada Gold Partner.
Posted Date
-
Due Date
Dec 2, 2025
City of Casa Grande
Close: Dec 2, 2025
The City of Casa Grande, Arizona, is seeking bids for security upgrades at its Water Reclamation Facility. The project involves the procurement, installation, integration, and testing of security systems, including access control panels, CCTV cameras, door and vehicle gate security hardware, and area lighting. Contractors must demonstrate relevant experience and certifications, including being a Verkada Gold Partner.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis