Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project consists of the following work: Schedule A - 190/35 Water Main Replacement Schedule A consists of the installation of approx. 18 LF of 8" restrained joint ductile iron water main, 280 LF of 6" restrained joint ductile iron water main, the replacement of seven (7) 1" water services, one (1) 2" blowoff assembly, appurtenances, and one connection to the existing system. Existing 2" water main and appurtenances shall be abandoned in place. Restoration includes trench patching, asphalt grind and overlay, and curb replacement. Schedule B - 190/60 Water Main Replacement: Schedule B consists of the installation of approx. 350 LF of 6" restrained joint ductile iron water main, the replacement of eleven (11) 1" water services, one (1) 2" blowoff and air-vac assembly, appurtenances, and one connection to the existing system. Existing 2" water main and appurtenances shall be abandoned in place. Restoration includes trench patching, asphalt grind and overlay, and curb and concrete replacement. In addition, all sewer manhole castings in the overlay area will be replaced. Schedule C - 198/64 Water Main Replacement: Schedule C consists of the installation of approx. 260 LF of 6" restrained joint ductile iron water main, the replacement of seven (7) 1" water services, one (1) 2" blowoff assembly, appurtenances, and one connection to the existing system. Water main is replaced primarily within a private utility and access easement. Existing 2” water main and appurtenances shall be abandoned in place. Restoration includes trench patching, asphalt grind and overlay. In addition, all sewer manhole castings in the overlay area will be replaced. Schedule D - 145/104 Water Main Replacement: Schedule D consists of the installation of approx. 360 LF of 6" restrained joint ductile iron water main, the replacement of nineteen (19) 1" water services, three (3) 2" blowoff assemblies, appurtenances, and three connections to the existing system. Existing 2” water main and appurtenances shall be abandoned in place. Restoration includes trench patching, asphalt grind and overlay, curb and concrete replacement. In addition, all sewer manhole castings in the overlay area will be replaced. Schedule E - Juanita/88 Water Main Replacement: Schedule E consists of the installation of approx. 190 LF of 6" restrained joint ductile iron water main, the replacement of six (6) 1" water services, one (1) 2" blowoff assembly, one (1) fire hydrant assembly, appurtenances, and one connection to the existing system. Existing 2" water main and appurtenances shall be abandoned in place. Restoration includes trench patching, asphalt grind and overlay. Schedule F - 120/80 Water Main Replacement: Schedule F consists of the installation of approx. 475 LF of 8" restrained joint ductile iron water main, 365 LF of 6" restrained joint ductile iron water main, the replacement of twenty-four (24) 1" water services, three (3) 2" blowoff assemblies, one (1) fire hydrant assembly, appurtenances, and one (1) connection to the existing system. Existing 2" water main and appurtenances shall be abandoned in place. Restoration includes trench patching and curb and concrete replacement. In addition, all sewer manhole castings in the overlay area will be replaced. Schedule G - 124/106 Water Main Replacement: Schedule G consists of the installation of approx. 675 LF of 8" restrained joint ductile iron water main, 105 LF of 6" restrained joint ductile iron water main, the replacement of sixteen (16) 1" water services, one (1) 2" blowoff assembly, one (1) fire hydrant assembly, appurtenances, and three (3) connection to the existing system. Existing AC water main and appurtenances shall be abandoned in place to the extent feasible. Restoration includes trench patching, asphalt grind and overlay, and curb and concrete replacement. In addition, all sewer manhole castings in overlay area will be replaced and three (3) ADA ramps will be installed.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The District of Columbia Water and Sewer Authority (DC Water) is soliciting qualifications to establish a Small Diameter Water Main Replacement Program to pre-qualify multiple contractors for future competitive task orders to replace 412" water mains and perform related work. Work includes replacement of small-diameter mains, installation of valves and appurtenances, water services up to 2", curb stops, meter boxes, building penetrations and permanent pavement restoration; some task orders may be federally funded and subject to domestic preference rules. The contract term is a one-year base with potential extensions and includes DBE (32%) and WBE (6%) inclusion goals and Davis-Bacon wage requirements.
Posted Date
Dec 3, 2025
Due Date
Dec 22, 2025
Release: Dec 3, 2025
Close: Dec 22, 2025
The District of Columbia Water and Sewer Authority (DC Water) is soliciting qualifications to establish a Small Diameter Water Main Replacement Program to pre-qualify multiple contractors for future competitive task orders to replace 412" water mains and perform related work. Work includes replacement of small-diameter mains, installation of valves and appurtenances, water services up to 2", curb stops, meter boxes, building penetrations and permanent pavement restoration; some task orders may be federally funded and subject to domestic preference rules. The contract term is a one-year base with potential extensions and includes DBE (32%) and WBE (6%) inclusion goals and Davis-Bacon wage requirements.
AvailablePittsburgh Water & Sewer Authority is requesting proposals for a QA/QC Coordinator to support the 2024 Small Diameter Water Main Replacement program, which includes replacement of small-diameter water mains, verification of service line materials, replacement of lead service lines, and restoration of disturbed areas. The project will be funded in part by PENNVEST and EPA financial assistance, so federal DBE and EPA requirements apply. Vendor questions are due January 6, 2026 and proposals are due January 13, 2026 at 4:00 PM local time.
Posted Date
Oct 30, 2025
Due Date
Jan 13, 2026
Release: Oct 30, 2025
Close: Jan 13, 2026
Pittsburgh Water & Sewer Authority is requesting proposals for a QA/QC Coordinator to support the 2024 Small Diameter Water Main Replacement program, which includes replacement of small-diameter water mains, verification of service line materials, replacement of lead service lines, and restoration of disturbed areas. The project will be funded in part by PENNVEST and EPA financial assistance, so federal DBE and EPA requirements apply. Vendor questions are due January 6, 2026 and proposals are due January 13, 2026 at 4:00 PM local time.
Pittsburgh Water & Sewer Authority is requesting proposals for a QA/QC Coordinator to support the 2024 Small Diameter Water Main Replacement program, which includes replacement of small-diameter water mains, verification of service line materials, replacement of lead service lines, and restoration of disturbed areas. The project will be funded in part by PENNVEST and EPA financial assistance, so federal DBE and EPA requirements apply. Vendor questions are due January 6, 2026 and proposals are due January 13, 2026 at 4:00 PM local time.
Posted Date
Oct 30, 2025
Due Date
Jan 13, 2026
Release: Oct 30, 2025
Close: Jan 13, 2026
Pittsburgh Water & Sewer Authority is requesting proposals for a QA/QC Coordinator to support the 2024 Small Diameter Water Main Replacement program, which includes replacement of small-diameter water mains, verification of service line materials, replacement of lead service lines, and restoration of disturbed areas. The project will be funded in part by PENNVEST and EPA financial assistance, so federal DBE and EPA requirements apply. Vendor questions are due January 6, 2026 and proposals are due January 13, 2026 at 4:00 PM local time.
Pittsburgh Water and Sewer Authority (Pittsburgh Water) is soliciting bids (IFB) for the 2024 Small Diameter Water Main Replacement Contract C to replace and upsize water mains, valves, service connections, and hydrants. The project is PENNVEST/EPA-funded and includes DBE/PENNVEST compliance and federal DBE requirements (40 CFR Part 33); proposers must submit extensive documentation (bid bond, experience schedules, financials, DBE compliance forms, Pricing Bid Table). The solicitation is open on Bonfire with a mandatory pre-bid virtual meeting, a questions deadline, and a public bid opening; submissions are made through the Bonfire portal.
Posted Date
Dec 11, 2025
Due Date
Jan 22, 2026
Release: Dec 11, 2025
Close: Jan 22, 2026
Pittsburgh Water and Sewer Authority (Pittsburgh Water) is soliciting bids (IFB) for the 2024 Small Diameter Water Main Replacement Contract C to replace and upsize water mains, valves, service connections, and hydrants. The project is PENNVEST/EPA-funded and includes DBE/PENNVEST compliance and federal DBE requirements (40 CFR Part 33); proposers must submit extensive documentation (bid bond, experience schedules, financials, DBE compliance forms, Pricing Bid Table). The solicitation is open on Bonfire with a mandatory pre-bid virtual meeting, a questions deadline, and a public bid opening; submissions are made through the Bonfire portal.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis