Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Request for Bids for the replacement of approximately 7,500 LF of 6-inch AC and PVC pipe water main with new 8-inch DI pipe, including pavement repair, milling, and overlay, within the Forest Valley neighborhood. Bidders must be pre-qualified under the annual pre-qualification for small diameter water main installation/replacement.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Approx. 7,500 LF of 6" AC and PVC pipe water main replacement with new 8" DI pipe within the Forest Valley neighborhood. Project also includes pavement repair and milling and overlay.
Posted Date
Jan 28, 2026
Due Date
Mar 12, 2026
Release: Jan 28, 2026
Close: Mar 12, 2026
Approx. 7,500 LF of 6" AC and PVC pipe water main replacement with new 8" DI pipe within the Forest Valley neighborhood. Project also includes pavement repair and milling and overlay.
AvailableConstruction of water mains and service connections in the City. This includes installing 1,250 LF of 12" water main, 275 LF of 8" water main, replacement of water service connections, associated facilities and appurtenances, as well as site restoration tasks such as backfilling, grading, and surface restoration.
Posted Date
Jan 8, 2026
Due Date
Jan 29, 2026
Release: Jan 8, 2026
Close: Jan 29, 2026
Construction of water mains and service connections in the City. This includes installing 1,250 LF of 12" water main, 275 LF of 8" water main, replacement of water service connections, associated facilities and appurtenances, as well as site restoration tasks such as backfilling, grading, and surface restoration.
Work consist of replacement of approximately 333' of 4" water main, 15' of 6" water main, 10,447' of 8" water main, 352' of 10" water main, 8' of 14" water main, and 121' of 16" water main; relocation of approx. 514' of 4" water main, 315' of 6" water main, 5,213' of 8" water main, and 611' of 10" water main; and installation through pipe bursting of approx. 96' of 8" water main as well as approx. 8,414' of water house connections, 8 LF of silt fence, replace existing main with 4" coated dip, furnish 4" coated dip, replace existing main with 6" coated dip including fire hydrant leads, furnish 6" coated dip including fire hydrant leads. See attached file.
Posted Date
Dec 23, 2025
Due Date
Feb 4, 2026
Release: Dec 23, 2025
Close: Feb 4, 2026
Work consist of replacement of approximately 333' of 4" water main, 15' of 6" water main, 10,447' of 8" water main, 352' of 10" water main, 8' of 14" water main, and 121' of 16" water main; relocation of approx. 514' of 4" water main, 315' of 6" water main, 5,213' of 8" water main, and 611' of 10" water main; and installation through pipe bursting of approx. 96' of 8" water main as well as approx. 8,414' of water house connections, 8 LF of silt fence, replace existing main with 4" coated dip, furnish 4" coated dip, replace existing main with 6" coated dip including fire hydrant leads, furnish 6" coated dip including fire hydrant leads. See attached file.
Replacement of approx. 1,250 LF of 8", and 200 LF of 6" ductile iron pipe water main and appurtenances including gate valves, hydrants, tapping sleeves and valves, water services, and incidental work including paving and concrete walk replacement.
Posted Date
-
Due Date
Mar 19, 2026
Release: -
Close: Mar 19, 2026
Replacement of approx. 1,250 LF of 8", and 200 LF of 6" ductile iron pipe water main and appurtenances including gate valves, hydrants, tapping sleeves and valves, water services, and incidental work including paving and concrete walk replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis