Summary
Work include mobilization. Demolition of existing dewatering equipment including centrifuges and appurtenances. Demolition of the dewatering building roof and raising of the building with a new roof structure. Temporary dewatering of sludge during modifications to the dewatering building. Structural and architectural improvements to the building. Installation of three (3) new dewatering screw presses and appurtenances. Installation of five (5) sludge feed pumps, piping and appurtenances. Installation of five (5) in-line sludge grinders, piping and appurtenances. Installation of five (5) polymer blending systems, piping and appurtenances. Installation of chemical feed pumps, piping and appurtenances. Installation of four (4) sludge storage tank submersible mixers and appurtenances. Heating and ventilating modifications to the dewatering building.