Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Gary Sanitary District
work consist of Remove existing manhole and replace with the new 4' dia precast manhole, Pipe burst existing 12" VCP pipe with new 12" -high density polyethylene (HDPE) pipe, CIPP line existing 12" dia pipe x 313 LF starting, repair existing 12" diameter pipe with 12" dia PVC SDR 35 14 LF, CIPP line existing 12" dia pipe x 148 LF.
Posted Date
Apr 12, 2026
Due Date
Apr 23, 2026
Release: Apr 12, 2026
Gary Sanitary District
Close: Apr 23, 2026
work consist of Remove existing manhole and replace with the new 4' dia precast manhole, Pipe burst existing 12" VCP pipe with new 12" -high density polyethylene (HDPE) pipe, CIPP line existing 12" dia pipe x 313 LF starting, repair existing 12" diameter pipe with 12" dia PVC SDR 35 14 LF, CIPP line existing 12" dia pipe x 148 LF.
AvailableGary Sanitary District
Work consist of remove and replace existing 12" dia pipe with 12" dia PVC sdr 35 240 LF, new pipe shall extend 4" into the inner surface of existing manholes, excavate, remove, and dispose offsite damage sewer and appurtenances, reconnect/repair active encountered "wye" connection for existing service lines/laterals including drainage pipes that are affected, clean the sewer, televise (cctv) and video the sewer,
Posted Date
Apr 12, 2026
Due Date
Apr 23, 2026
Release: Apr 12, 2026
Gary Sanitary District
Close: Apr 23, 2026
Work consist of remove and replace existing 12" dia pipe with 12" dia PVC sdr 35 240 LF, new pipe shall extend 4" into the inner surface of existing manholes, excavate, remove, and dispose offsite damage sewer and appurtenances, reconnect/repair active encountered "wye" connection for existing service lines/laterals including drainage pipes that are affected, clean the sewer, televise (cctv) and video the sewer,
AvailableGary Sanitary District
Supply and delivery of a new administration building heating and cooling multi-zone unit.
Posted Date
Mar 26, 2026
Due Date
Apr 17, 2026
Release: Mar 26, 2026
Gary Sanitary District
Close: Apr 17, 2026
Supply and delivery of a new administration building heating and cooling multi-zone unit.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Gary Sanitary District's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database