Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
RFP for slip-out repair and bank stabilization services near 1780 Higgins Canyon Road, approximately 200 feet in length.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes : masonry work to repair the wwi shrine and memorial. It will include structural repairs, repointing, paving repairs, sealant joint replacement, new lighting, masonry cleaning and the refinishing of metal components. Stream improvements will include removal of the existing dam, repairs to the stone channel walls and stone arch bridge, and stream bank restoration and stabilization.
Posted Date
Dec 11, 2025
Due Date
Jan 14, 2026
Release: Dec 11, 2025
Close: Jan 14, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes : masonry work to repair the wwi shrine and memorial. It will include structural repairs, repointing, paving repairs, sealant joint replacement, new lighting, masonry cleaning and the refinishing of metal components. Stream improvements will include removal of the existing dam, repairs to the stone channel walls and stone arch bridge, and stream bank restoration and stabilization.
AvailableThe work generally consists of reconstructing the east bank. Work includes excavation, clearing and grubbing, embankment reconstruction, placement of soil-filled rock slope protection, temporary creek diversion and dewatering, temporary traffic control, hydroseeding, and pavement reconstruction.
Posted Date
-
Due Date
Jan 13, 2026
Release: -
Close: Jan 13, 2026
The work generally consists of reconstructing the east bank. Work includes excavation, clearing and grubbing, embankment reconstruction, placement of soil-filled rock slope protection, temporary creek diversion and dewatering, temporary traffic control, hydroseeding, and pavement reconstruction.
AvailableWork include repair and replacement of the decking system at the front porch and restoration of the existing front porch columns and pilasters. Repair and replacement of the decking system at the rear porch and replacement of the rear porch columns and pilasters. Replacement of the railing system at the rear porch and stairwell. Restoration of the existing wood windows and frames. Replacement of the existing wood basement windows and frames. Restoration of the exterior doors and frames, including sidelights and transoms. Repair of deteriorated wood elements on the exterior envelope.
Posted Date
Dec 8, 2025
Due Date
Feb 27, 2026
Release: Dec 8, 2025
Close: Feb 27, 2026
Work include repair and replacement of the decking system at the front porch and restoration of the existing front porch columns and pilasters. Repair and replacement of the decking system at the rear porch and replacement of the rear porch columns and pilasters. Replacement of the railing system at the rear porch and stairwell. Restoration of the existing wood windows and frames. Replacement of the existing wood basement windows and frames. Restoration of the exterior doors and frames, including sidelights and transoms. Repair of deteriorated wood elements on the exterior envelope.
AvailableThe Department of Veterans Affairs is soliciting quotes for generator preventative maintenance, repair services, and annual load bank testing at the Jack C. Montgomery VA Medical Center in Muskogee, Oklahoma. The contractor must provide personnel, parts, materials, testing (including load bank testing), and comply with OSHA, EPA, NFPA and VA requirements, respond to emergency call-backs within 4 hours, and use authentic manufacturer parts. The solicitation is an RFQ (36C25926Q0084) with a public solicitation document attached on SAM.gov and is open for responses.
Posted Date
Dec 23, 2025
Due Date
Jan 12, 2026
Release: Dec 23, 2025
Close: Jan 12, 2026
The Department of Veterans Affairs is soliciting quotes for generator preventative maintenance, repair services, and annual load bank testing at the Jack C. Montgomery VA Medical Center in Muskogee, Oklahoma. The contractor must provide personnel, parts, materials, testing (including load bank testing), and comply with OSHA, EPA, NFPA and VA requirements, respond to emergency call-backs within 4 hours, and use authentic manufacturer parts. The solicitation is an RFQ (36C25926Q0084) with a public solicitation document attached on SAM.gov and is open for responses.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →