Sixth Street, Avenue F & Avenue E Improvements
Work includes locating existing utilities, removing brush and trees smaller than 6", removing asphalt detour pavement or temporary asphalt pavement, adjusting water valve stacks, meters, removing valves and fittings, substituting 5" of non-reinforced concrete for the asphalt detours, concrete curb is incidental to concrete pavement, field adjusting locations of taps, connections, manholes, junction boxes, driveways, ramps, sidewalks, signs, and other miscellaneous appurtenances, painting of steel railings, repairs to driveways, fences, walls, landscaping, irrigation and other private property. See outside link.