Special DistrictCA
Posted
Sep 4, 2026
Oct 22, 2026
415 And 500 Reservoir Lining Project RFP
Work consists of final subgrade preparation and geomembrane lining of the Reservoir. work consisting generally of initial dewatering; removal of muck, sediment, soft or wet material, and designated existing concrete; handling or disposal of removed material; placement of approved fill; compaction of District-placed fill; and rough grading to within plus or minus 0.5' of the design finished subgrade elevations.