OtherAZ
Posted
Nov 19, 2026
Dec 17, 2026
Canyon Ranch Road - Wet Utilities RFP
Work consist of 4,650 lf of roadway of wet utilities.
Description: The scope calls for installation of wet-utility infrastructure for residential projects in San Francisco, including piping, manholes, and utility connections. It covers water, sewer, and storm-drain systems. The work is intended to deliver a functional wet-utility system.
City · CA, US
Adjacent opportunities open for bidding right now.
OtherAZ
Posted
Nov 19, 2026
Dec 17, 2026
Work consist of 4,650 lf of roadway of wet utilities.
Huron Independent School District
School DistrictMI
Posted
Nov 17, 2026
Dec 3, 2026
This solicitation covers the earthwork and site utilities package for a classrooms addition construction project. The scope includes excavation protection, soil erosion control, demolition, grading, utility installation, and site restoration. The buyer’s related procurement is identified as Huron ISD Classrooms Addition, solicitation RFP-HISD-270000000327-1.
Special DistrictCA
Posted
Nov 5, 2026
Dec 15, 2026
Provide on-call, closed circuit television inspections (CCTV) of pipelines; cleaning of sewer and storm drain pipelines; repairs of water, sewer, storm drain, fuel and natural gas pipelines; other wet utility appurtenances repair and construction; wet utility pipeline removal and reconstruction; and/or cured-in-place pipe construction; Vactor truck, and hydro jetting operations.
Sonoma Valley Fire & Rescue Authority
Fire DepartmentCA
Posted
Nov 14, 2026
Nov 25, 2026
Sitework includes demo of existing pavement and concrete, demo sewer line up to septic system and new tie-in. New water mains, upsized sewer to septic system, new pad mounted transformer, new backup generator, new paving, landscaping and bio-retention areas.
Solicitation files and supporting documents for this bid.
Decision makers connected to this RFP from City and County of San Francisco.