Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This project demolishes Chiller CH-03A, Cooling Towers CT-01 through CT-04, condenser water pumps, electrical motor control centers, and abandoned HTHW piping. Chiller CH-05, a 2,800-ton electric centrifugal chiller will be installed in the location of Chiller CH-03A. Field erected counterflow Cooling Towers CT-01 through CT-04 will be installed in the existing concrete cooling tower basin. Condenser Water Pumps CSP-01 through CSP-04 will be installed in the basement. Condenser water supply lines from Cooling Towers CT-01 through CT-04 will be interconnected with Cooling Towers CT-05 and CT-06. Condenser water suction and discharge branch piping will allow any condenser water pump to operate with any chiller or cooling tower cell. The project will provide variable frequency drives and reduced voltage solid-state motor starters for new equipment. Two motor control centers will be installed to new and existing plant loads. The existing Honeywell control system will be extended to remotely monitor and control Chillers CH-04 and CH-05, Cooling Towers CT-01 through CT-04, and Condenser Water Pumps CSP-01 through CSP-04.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes chiller replacement.
Posted Date
Oct 20, 2025
Due Date
Dec 30, 2025
Release: Oct 20, 2025
Close: Dec 30, 2025
Work includes chiller replacement.
AvailableSeeking proposals for the provision of chiller replacement.
Posted Date
Nov 21, 2025
Due Date
Dec 19, 2025
Release: Nov 21, 2025
Close: Dec 19, 2025
Seeking proposals for the provision of chiller replacement.
AvailableReplacement of a Chiller at Shawnee Elementary School.
Posted Date
Dec 12, 2025
Due Date
Jan 16, 2026
Release: Dec 12, 2025
Close: Jan 16, 2026
Replacement of a Chiller at Shawnee Elementary School.
AvailableRelease: Dec 4, 2025
Close: Dec 23, 2025
Chiller replacement
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis