Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This project demolishes Chiller CH-03A, Cooling Towers CT-01 through CT-04, condenser water pumps, electrical motor control centers, and abandoned HTHW piping. Chiller CH-05, a 2,800-ton electric centrifugal chiller will be installed in the location of Chiller CH-03A. Field erected counterflow Cooling Towers CT-01 through CT-04 will be installed in the existing concrete cooling tower basin. Condenser Water Pumps CSP-01 through CSP-04 will be installed in the basement. Condenser water supply lines from Cooling Towers CT-01 through CT-04 will be interconnected with Cooling Towers CT-05 and CT-06. Condenser water suction and discharge branch piping will allow any condenser water pump to operate with any chiller or cooling tower cell. The project will provide variable frequency drives and reduced voltage solid-state motor starters for new equipment. Two motor control centers will be installed to new and existing plant loads. The existing Honeywell control system will be extended to remotely monitor and control Chillers CH-04 and CH-05, Cooling Towers CT-01 through CT-04, and Condenser Water Pumps CSP-01 through CSP-04.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide Chiller Replacement .
Posted Date
Nov 15, 2025
Due Date
Dec 16, 2025
Release: Nov 15, 2025
Close: Dec 16, 2025
Provide Chiller Replacement .
AvailableWork includes removal of current water-cooled chiller, pumps, and cooling tower and installation of new air-cooled chiller and pumps along with lines for a temporary chiller in case the primary chiller is non-functional. An air-cooled chiller has been purchased by the city under a separate contract. All other materials are to be furnished by the contractor.
Posted Date
Oct 28, 2025
Due Date
Dec 16, 2025
Release: Oct 28, 2025
Close: Dec 16, 2025
Work includes removal of current water-cooled chiller, pumps, and cooling tower and installation of new air-cooled chiller and pumps along with lines for a temporary chiller in case the primary chiller is non-functional. An air-cooled chiller has been purchased by the city under a separate contract. All other materials are to be furnished by the contractor.
AvailableHospital chiller replacement.
Posted Date
Dec 3, 2025
Due Date
Dec 16, 2025
Release: Dec 3, 2025
Close: Dec 16, 2025
Hospital chiller replacement.
AvailableWork includes tunnel piping and chiller replacement.
Posted Date
-
Due Date
Dec 16, 2025
Close: Dec 16, 2025
Work includes tunnel piping and chiller replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis