Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Montgomery County Housing Authority (MCHA) has issued an Invitation for Bids (IFB) for mechanical, electrical, and plumbing construction. This project involves the replacement of boilers and thermostats, and the installation of domestic hot water heaters at the Sidney Pollock House in Pottstown, PA. The solicitation opened on January 15, 2026, and bids must be submitted electronically via the PennBid Program by January 29, 2026.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Hot Water Boiler Replacement.
Posted Date
Dec 25, 2025
Due Date
Jan 21, 2026
Release: Dec 25, 2025
Close: Jan 21, 2026
Hot Water Boiler Replacement.
AvailableDomestic boiler replacement.
Posted Date
Jan 12, 2026
Due Date
Feb 17, 2026
Release: Jan 12, 2026
Close: Feb 17, 2026
Domestic boiler replacement.
AvailableReplacement of (2) domestic hot water heaters. Located in the southeast corner of the pool mechanical room. Handles domestic hot water for the entire facility, with the exception of the northwest corner. Current units: AO Smith Cyclone Xi model BTH 400A 104 natural gas units. Needs removal and approved disposal of current units, and replacement with (2) 399,900 BTU/hr 119 gallon commercial gas-fired condensing water heaters.
Posted Date
Dec 18, 2025
Due Date
Jan 20, 2026
Release: Dec 18, 2025
Close: Jan 20, 2026
Replacement of (2) domestic hot water heaters. Located in the southeast corner of the pool mechanical room. Handles domestic hot water for the entire facility, with the exception of the northwest corner. Current units: AO Smith Cyclone Xi model BTH 400A 104 natural gas units. Needs removal and approved disposal of current units, and replacement with (2) 399,900 BTU/hr 119 gallon commercial gas-fired condensing water heaters.
Provide architect/engineer services to complete construction documents and specifications for the install instantaneous hot water heater project. The project design includes developing a phasing plan for construction when replacing the existing domestic hot water tanks in Building 89 and Building 92/93.
Posted Date
Dec 23, 2025
Due Date
Feb 3, 2026
Release: Dec 23, 2025
Close: Feb 3, 2026
Provide architect/engineer services to complete construction documents and specifications for the install instantaneous hot water heater project. The project design includes developing a phasing plan for construction when replacing the existing domestic hot water tanks in Building 89 and Building 92/93.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis