Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Hot Water Boiler Replacement.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The City of New Bedford is soliciting sealed bids to replace the boiler at the Wilks Branch Library located at 1911 Acushnet Avenue in New Bedford, Massachusetts. A site visit is scheduled for Wednesday, December 17, 2025 at 10:00 AM. Bids are due by 2:00 PM ET on January 12, 2026 via the Commonwealth’s COMMBUYS portal, with documents distributed via BidNet Direct.
Posted Date
Dec 9, 2025
Due Date
Jan 12, 2026
Release: Dec 9, 2025
Close: Jan 12, 2026
The City of New Bedford is soliciting sealed bids to replace the boiler at the Wilks Branch Library located at 1911 Acushnet Avenue in New Bedford, Massachusetts. A site visit is scheduled for Wednesday, December 17, 2025 at 10:00 AM. Bids are due by 2:00 PM ET on January 12, 2026 via the Commonwealth’s COMMBUYS portal, with documents distributed via BidNet Direct.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The County of Santa Barbara is soliciting competitive bids to replace the boiler system at the Santa Maria Building C, including installation of an owner-supplied redundant boiler, replacement of chemical pot feeder and air/water separator, replacement of expansion tank, new natural gas line connections, and associated controls work. A mandatory job walk/site visit is scheduled for 2026-01-13 and questions are due by 2026-01-15; bidders must hold a California Class A or B contractor license and comply with prevailing wage and other applicable laws. Bids are due by 2026-01-29 and the project duration is approximately 180 days.
Posted Date
Dec 18, 2025
Due Date
Jan 29, 2026
Release: Dec 18, 2025
Close: Jan 29, 2026
The County of Santa Barbara is soliciting competitive bids to replace the boiler system at the Santa Maria Building C, including installation of an owner-supplied redundant boiler, replacement of chemical pot feeder and air/water separator, replacement of expansion tank, new natural gas line connections, and associated controls work. A mandatory job walk/site visit is scheduled for 2026-01-13 and questions are due by 2026-01-15; bidders must hold a California Class A or B contractor license and comply with prevailing wage and other applicable laws. Bids are due by 2026-01-29 and the project duration is approximately 180 days.
AvailableTexas Southmost College (TSC) is soliciting proposals for replacement of chilled and hot water piping systems at its campus, including removal and replacement of existing chilled and hot water piping to ensure efficient operation and compliance with applicable codes. The solicitation (RFP 26-06) posts specifications, drawings, and required response templates on the TSC Bonfire portal, and includes a non-mandatory pre-proposal conference and an in-person bid opening. Questions are due 2026-01-08 and proposals are due 2026-01-14.
Posted Date
Dec 20, 2025
Due Date
Jan 14, 2026
Release: Dec 20, 2025
Close: Jan 14, 2026
Texas Southmost College (TSC) is soliciting proposals for replacement of chilled and hot water piping systems at its campus, including removal and replacement of existing chilled and hot water piping to ensure efficient operation and compliance with applicable codes. The solicitation (RFP 26-06) posts specifications, drawings, and required response templates on the TSC Bonfire portal, and includes a non-mandatory pre-proposal conference and an in-person bid opening. Questions are due 2026-01-08 and proposals are due 2026-01-14.
AvailableBoiler replacement.
Posted Date
Jan 5, 2026
Due Date
Feb 4, 2026
Release: Jan 5, 2026
Close: Feb 4, 2026
Boiler replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →